Equity
Debts exceed assets in financial year 2025.
Debts exceed assets in financial year 2025.
Every financial year from 2022 to 2025 closed with a loss. 2022 was the heaviest.
Turnover fell in 2025 from €124,400 to €34,400.
Of this, €891,066 falls due within a year.
CONSTRUCT ME pays its suppliers 136 days earlier than in 2024. Customers pay 1,398 days later.
Lower solvency than 95% of companies in construction of buildings. Sector median 32.9% · 1,038 companies.
In July 2024, 598 companies had the same profile as CONSTRUCT ME has now. Each dot stands for 2 companies, two years later.
Another 1.3% stopped without a precise date, possibly only after those two years.
The method was tested on the 497,331 companies of July 2024. Each company was given the bankruptcy share of the same profile a year earlier, in July 2023. The expectation was that 1.6% would go bankrupt within 24 months. In fact 1.7% went bankrupt.
| Group | Expected | Actual |
|---|---|---|
| 1 | 0.2% | 0.2% |
| 2 | 0.3% | 0.5% |
| 3 | 0.5% | 0.6% |
| 4 | 0.7% | 0.8% |
| 5 | 0.9% | 0.9% |
| 6 | 1.3% | 1.5% |
| 7 | 1.6% | 1.8% |
| 8 | 1.8% | 1.8% |
| 9 | 2.9% | 3.1% |
| 10 | 5.6% | 6.1% |
A company that went bankrupt had a higher expected share than one that kept going in 74.5% of comparisons. The level depends on the economy. In a year with more bankruptcies than the year before, the actual share is higher than the expected one.
This is an observation about 598 companies, not a prediction for CONSTRUCT ME. The sector does not count, because the KBO no longer lists a sector for a company that has stopped. By sector, mostly the survivors would count, which would paint too rosy a picture.
Show the recommended maximum and see how the verdict changes with amount, term and advance.
The scores and ratios are Checked's own calculations, not a credit decision.
| Company | ||||
|---|---|---|---|---|
| CONSTRUCT ME Waterloo | €34,400 | - | -185.5% | - |
| ATSA Kapellen | €51,157 | -3.1% | 8.1% | - |
| PH-Design Heusden-Zolder | €122,515 | - | -2.2% | 0.8 |
| FREELAB Brussels | €70,580 | 79.5% | 5.9% | - |
| 2*PI*R Theux | €13,244 | - | -14.8% | - |
| BUD CONCEPT Uccle | €91,480 | -52.0% | 56.4% | - |
| BDR-groupe Waterloo | €52,815 | - | 79.7% | - |
These companies have the same main activity as CONSTRUCT ME: general construction of residential buildings (NACE 41001). They are comparable in size and age: total assets between €1.1m and €5.4m, founded between 1973 and 2015.
CONSTRUCT ME has existed since 2012. The balance sheet total fell from €74.9m in 2015 to €18.9m in 2016.
Solvency rose in 2025 from -223.7% to -185.5%.
holds all the shares. In April 2025, the Official Gazette published the appointment of as managing director.
Sources: KBO register, filings at the National Bank, Belgian Official Gazette.
Lower than 95% of 1,038 companies in 2025.
Higher than 85% of 1,017 companies in 2025.
Higher than 9% of 1,033 companies in 2025.
Net result: bottom quarter · Equity: bottom quarter · Balance sheet total: middle half · Working capital: top quarter
| Line | Trend | 2025 | 2024 | 2023 | 2022 | 2021 | 2020 | 2019 | 2018 | 2017 | 2016 | 2015 | 2014 | 2013 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Balance sheet: assets | ||||||||||||||
20/58 |
3.9m | 3.1m | 3.0m | 4.8m | 17.3m | 16.0m | 15.4m | 10.6m | 15.6m | 18.9m | 74.9m | 63.5m | 23.0m | |
21/28 |
- | - | 0 | 700 | 1.2m | 720,570 | 419,893 | 364,386 | 263,106 | 4.1m | 11.8m | 14.0m | 128,117 | |
22/27 |
- | - | 0 | - | - | - | - | 299 | 4,748 | 35,379 | 66,699 | 98,641 | 128,117 | |
24 |
- | - | 0 | - | - | - | - | - | - | - | 140 | 902 | 1,738 | |
26 |
- | - | 0 | - | - | - | - | 299 | 4,748 | 35,379 | 66,559 | 97,739 | 126,379 | |
28 |
- | - | - | 700 | 1.2m | 720,570 | 419,893 | 364,087 | 258,359 | 4.1m | 11.7m | 13.9m | - | |
280/1 |
- | - | - | - | 1.2m | 719,870 | 419,193 | 364,087 | 258,359 | 4.1m | 11.7m | 13.9m | - | |
281 |
- | - | - | - | 1.2m | 719,870 | 419,193 | 364,087 | 258,359 | 4.1m | 11.7m | 13.9m | - | |
284/8 |
- | - | - | 700 | 700 | 700 | 700 | - | - | - | - | - | - | |
285/8 |
- | - | - | 700 | 700 | 700 | 700 | - | - | - | - | - | - | |
29/58 |
3.9m | 3.1m | 3.0m | 4.8m | 16.1m | 15.3m | 15.0m | 10.2m | 15.3m | 14.8m | 63.1m | 49.5m | 22.8m | |
3 |
3.0m | 1.9m | 1.9m | 2.7m | 6.8m | 4.4m | 9.1m | 3.9m | 5.8m | 9.7m | 58.6m | 37.0m | 15.9m | |
30/36 |
192,074 | 214,671 | 293,760 | 293,760 | 233,330 | 704,033 | 704,033 | 1.0m | 637,770 | 771,472 | - | - | - | |
35 |
192,074 | 214,671 | 293,760 | 293,760 | 233,330 | 704,033 | 704,033 | 1.0m | 637,770 | 771,472 | - | - | - | |
37 |
2.8m | 1.7m | 1.6m | 2.4m | 6.6m | 3.7m | 8.4m | 2.9m | 5.1m | 8.9m | 58.6m | 37.0m | 15.9m | |
40/41 |
320,205 | 214,562 | 244,728 | 258,736 | 7.8m | 6.5m | 5.5m | 5.5m | 4.4m | 4.4m | 3.8m | 3.2m | 1.8m | |
40 |
182,716 | 184,471 | 221,469 | 258,736 | 7.8m | 6.5m | 5.1m | 5.4m | 4.3m | 4.3m | 3.6m | 3.1m | 1.8m | |
41 |
137,489 | 30,091 | 23,259 | - | 10,000 | 25,498 | 423,004 | 72,677 | 71,966 | 46,844 | 194,957 | 96,104 | - | |
54/58 |
584,349 | 904,653 | 874,183 | 1.9m | 1.5m | 4.3m | 277,320 | 815,805 | 5.2m | 775,918 | 616,933 | 9.2m | 5.1m | |
490/1 |
11,264 | - | - | 14,786 | 34,340 | 57,217 | 60,796 | 15,147 | 30,492 | 26,593 | - | 318 | 124 | |
| Balance sheet: equity and liabilities | ||||||||||||||
10/49 |
3.9m | 3.1m | 3.0m | 4.8m | 17.3m | 16.0m | 15.4m | 10.6m | 15.6m | 18.9m | 74.9m | 63.5m | 23.0m | |
10/15 |
-7.3m | -6.9m | -6.5m | -5.8m | 624,274 | -826,401 | -3.4m | -2.3m | -2.5m | -1.5m | 4.4m | 4.7m | 5.0m | |
10/11 |
5.0m | 5.0m | 5.0m | 5.0m | 5.0m | 5.0m | 5.0m | 5.0m | 5.0m | 5.0m | 5.0m | 5.0m | 5.0m | |
10 |
5.0m | 5.0m | 5.0m | 5.0m | 5.0m | - | - | - | - | - | - | - | - | |
100 |
5.0m | 5.0m | 5.0m | 5.0m | 5.0m | 5.0m | 5.0m | 5.0m | 5.0m | 5.0m | 5.0m | 5.0m | 5.0m | |
14 |
-12.3m | -11.9m | -11.5m | -10.8m | -4.4m | -5.8m | -8.4m | -7.4m | -7.5m | -6.5m | -639,852 | -281,936 | -32,023 | |
16 |
594,000 | 594,000 | 547,500 | 605,500 | 878,237 | - | - | - | - | - | - | - | - | |
160/5 |
594,000 | 594,000 | 547,500 | 605,500 | 878,237 | - | - | - | - | - | - | - | - | |
162 |
594,000 | 594,000 | 547,500 | 605,500 | 878,237 | - | - | - | - | - | - | - | - | |
17/49 |
10.6m | 9.3m | 9.0m | 10.0m | 15.8m | 16.8m | 18.8m | 12.9m | 18.1m | 20.5m | 70.5m | 58.7m | 18.0m | |
17 |
9.7m | 8.8m | 8.4m | 8.8m | 11.0m | 7.8m | 3.5m | 2.0m | 5.5m | 6.2m | 631,389 | 42,748 | 7.3m | |
178/9 |
9.7m | 8.8m | 8.4m | 8.8m | 11.0m | 7.8m | 3.5m | 2.0m | 5.5m | 6.2m | 631,389 | 42,748 | 7.3m | |
42/48 |
891,066 | 489,126 | 575,738 | 1.3m | 4.7m | 9.0m | 15.3m | 10.6m | 12.7m | 14.3m | 69.9m | 58.7m | 10.7m | |
42 |
- | - | - | - | - | - | 1,708 | 1,661 | - | 508,943 | 2.2m | 2.2m | - | |
43 |
- | - | - | - | 1.3m | 2.3m | 10.4m | 6.5m | 5.6m | 2.0m | 12.7m | 17.4m | - | |
430/8 |
- | - | - | - | 1.3m | 2.3m | 10.4m | 6.5m | 5.6m | 2.0m | 12.7m | 17.4m | - | |
44 |
891,066 | 489,126 | 575,738 | 1.1m | 3.0m | 6.5m | 4.9m | 4.1m | 5.1m | 4.5m | 4.6m | 5.4m | 3.9m | |
440/4 |
891,066 | 489,126 | 575,738 | 1.1m | 3.0m | 6.5m | 4.9m | 4.1m | 5.1m | 4.5m | 4.6m | 5.4m | 3.9m | |
46 |
- | - | 0 | - | - | - | - | - | - | - | 48.6m | 33.4m | 5.9m | |
45 |
- | - | - | 157,065 | 454,634 | 136,982 | - | 40,356 | 637,610 | - | - | 343,254 | 822,253 | |
450/3 |
- | - | - | 157,065 | 454,634 | 136,982 | - | 40,356 | 637,610 | - | - | 343,254 | 822,253 | |
47/48 |
- | - | - | 44,863 | 3,470 | - | - | - | 1.3m | 7.3m | 1.8m | - | - | |
492/3 |
- | - | - | - | - | - | - | 360,545 | - | - | 2,114 | 7,605 | 44 | |
| Income statement | ||||||||||||||
70/76A |
1.0m | 502,221 | -148,501 | -1.8m | 18.0m | 17.6m | 6.0m | 10.9m | 15.5m | 65.6m | 22.1m | 21.3m | 16.0m | |
70 |
34,400 | 124,400 | - | 39.4m | 425,000 | - | 388,724 | 28.1m | 40,167 | 53.7m | 75 | - | - | |
71 |
958,913 | 1,217 | -797,292 | -41.6m | 16.9m | 17.6m | 5.5m | -18.9m | 15.0m | 11.3m | 21.6m | 21.1m | 15.9m | |
74 |
11,350 | 376,604 | 645,191 | 321,412 | 658,129 | - | - | - | - | - | - | - | - | |
76A |
- | - | 3,600 | - | - | - | - | - | - | - | - | - | - | |
60/66A |
1.1m | 535,252 | 359,766 | 4.4m | 16.3m | 14.4m | 6.7m | 10.5m | 16.1m | 71.1m | 22.2m | 21.1m | 15.9m | |
60 |
22,597 | 79,089 | - | - | - | 125,990 | - | 557,300 | 2.1m | 60.7m | - | - | - | |
600/8 |
22,597 | 79,089 | - | - | - | 125,990 | - | - | 149,563 | 715,809 | - | - | - | |
609 |
- | - | - | - | - | - | - | 557,300 | 1.9m | 60.0m | - | - | - | |
61 |
1.1m | 339,128 | 361,313 | 4.7m | 15.4m | 14.2m | 6.7m | 9.9m | 13.8m | 10.3m | 22.1m | 21.1m | 15.8m | |
630 |
- | - | - | - | - | - | 299 | 4,449 | 30,632 | 31,320 | 31,942 | 31,717 | 28,049 | |
631/4 |
- | - | - | - | - | 51,816 | 10,081 | - | - | - | - | - | - | |
635/8 |
- | 46,500 | -58,000 | -272,737 | 878,237 | - | - | - | - | - | - | - | - | |
640/8 |
2,065 | 25,158 | 13,305 | 14,578 | 8,117 | 15,025 | 10,405 | 27,546 | 152,373 | 853 | 162,194 | 349 | 964 | |
66A |
413 | 45,377 | 43,149 | - | - | - | - | - | - | - | - | - | - | |
9901 |
-113,818 | -33,031 | -508,267 | -6.3m | 1.7m | 3.2m | -745,842 | 422,983 | -582,019 | -5.5m | -168,171 | 159,503 | 79,903 | |
75/76B |
38,843 | 10 | - | 75,697 | 26,209 | 14,411 | 14,135 | 4,972 | 5,154 | 163,809 | 246,819 | 149,837 | 26,493 | |
75 |
38,843 | 10 | - | 75,697 | 26,209 | 14,411 | 14,135 | 4,972 | 5,154 | 163,809 | 246,819 | 149,837 | 26,493 | |
750 |
- | 0 | - | 74,611 | 25,615 | 10,677 | 11,506 | - | - | - | - | - | - | |
751 |
- | - | - | - | - | - | 2,629 | 4,729 | 5,151 | 163,808 | 246,819 | 149,836 | 25,932 | |
752/9 |
38,843 | 10 | - | 1,087 | 594 | 3,734 | - | 243 | 3 | 1 | 0 | 2 | 561 | |
65/66B |
323,973 | 348,189 | 165,375 | 233,809 | 217,031 | 532,839 | 320,005 | 258,430 | 402,945 | 608,459 | 436,410 | 559,380 | 138,293 | |
65 |
323,973 | 348,189 | 165,375 | 233,809 | 217,031 | 532,839 | 320,005 | 258,430 | 402,945 | 608,459 | 436,410 | 559,380 | 138,293 | |
650 |
279,928 | 340,087 | 156,582 | 118,543 | 25,615 | 241,317 | 201,041 | 6,389 | 11,289 | 163,799 | 241,834 | 191,097 | 21,058 | |
652/9 |
44,046 | 8,102 | 8,793 | 115,267 | 191,416 | 291,521 | 118,965 | 252,041 | 391,656 | 444,660 | 194,576 | 368,283 | 117,235 | |
9903 |
-398,948 | -381,210 | -673,642 | -6.4m | 1.5m | 2.7m | -1.1m | 169,525 | -979,810 | -5.9m | -357,762 | -250,039 | -31,897 | |
67/77 |
- | - | - | 2,394 | 35,544 | 136,982 | - | - | 359 | - | 153 | -126 | 126 | |
670/3 |
- | - | - | 2,394 | 36,541 | 136,982 | - | - | 359 | - | 153 | - | 126 | |
77 |
- | - | - | - | 997 | - | - | - | - | - | - | 126 | - | |
9904 |
-398,948 | -381,210 | -673,642 | -6.4m | 1.5m | 2.6m | -1.1m | 169,525 | -980,169 | -5.9m | -357,916 | -249,913 | -32,023 | |
9905 |
-398,948 | -381,210 | -673,642 | -6.4m | 1.5m | 2.6m | -1.1m | 169,525 | -980,169 | -5.9m | -357,916 | -249,913 | -32,023 | |
| Appropriation of the result | ||||||||||||||
9906 |
-12.3m | -11.9m | -11.5m | -10.8m | -4.4m | -5.8m | -8.4m | -7.4m | -7.5m | -6.5m | -639,852 | -281,936 | -32,023 | |
14P |
-11.9m | -11.5m | -10.8m | -4.4m | -5.8m | - | - | - | - | - | - | - | - | |
| Document | ||||||||||||||
The notes to these accounts have 26 items, including the statement of assets and debts, the cost breakdown and rights and commitments. You find them in the accounts filed with the NBB.
Source: Annual accounts 2025 at the NBB, filed on 08-07-2026.
| Financial year | Type | Filed | Reference | Document |
|---|---|---|---|---|
| 31-12-2025 | full format | 08-07-2026 | 2026-00281240 | |
| 31-12-2024 | full format | 04-07-2025 | 2025-00245290 | |
| 31-12-2023 | full format | 21-08-2024 | 2024-00356580 | |
| 31-12-2022 | full format | 03-07-2023 | 2023-00199486 | |
| 31-12-2021 | full format | 19-07-2022 | 2022-20207134 | |
| 31-12-2020 | full format | 14-07-2021 | 2021-37200081 | |
| 31-12-2019 | full format | 22-09-2020 | 2020-55800439 | |
| 31-12-2018 | full format | 09-07-2019 | 2019-31200308 | |
| 31-12-2017 | full format | 24-08-2018 | 2018-49900566 | |
| 31-12-2016 | full format | 04-07-2017 | 2017-28800218 | |
| 31-12-2015 | full format | 19-07-2016 | 2016-34400437 | |
| 31-12-2014 | full format | 31-07-2015 | 2015-38800452 | |
| 31-12-2013 | full format | 20-06-2014 | 2014-20200406 |
| Line | Trend | 2025 | 2024 | 2023 | 2022 | 2021 | 2020 | 2019 | 2018 | 2017 | 2016 | 2015 | 2014 | 2013 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| - | - | - | - | - | - | -745,544 | 427,431 | -551,387 | -5.4m | -136,229 | 191,220 | 107,952 | ||
| - | - | - | - | - | - | -1.1m | 173,973 | -949,537 | -5.9m | -325,974 | -218,196 | -3,974 | ||
| - | - | - | - | - | - | 55,805 | 105,729 | -3.8m | -7.7m | -2.2m | 2,241 | 156,166 | ||
| -320,304 | 30,470 | -1.0m | 431,167 | -2.8m | 4.0m | -538,485 | -4.3m | 4.4m | 158,986 | -8.6m | 4.1m | - | ||
| 3.0m | 2.6m | 2.5m | 3.6m | 11.3m | 6.2m | -321,931 | -379,744 | 2.7m | 541,608 | -6.8m | -9.2m | 12.1m | ||
| - | -26.6% | - | -15.9% | - | - | - | 1.5% | - | -10.2% | - | - | - | ||
| -185.5% | -223.7% | -212.4% | -119.8% | 3.6% | -5.2% | -22.0% | -22.1% | -16.1% | -8.1% | 5.8% | 7.5% | 21.7% | ||
| 4.39 | 6.26 | 5.29 | 3.84 | 3.39 | 1.69 | 0.98 | 0.96 | 1.21 | 1.04 | 0.90 | 0.84 | 2.14 | ||
| 1.03 | 2.29 | 1.94 | 1.73 | 1.95 | 1.20 | 0.38 | 0.60 | 0.76 | 0.36 | 0.06 | 0.21 | 0.65 | ||
| - | - | - | - | 25.31 | - | - | - | - | - | 16.10 | 12.40 | 3.60 | ||
| - | - | - | - | 232.4% | - | - | - | - | - | -8.2% | -5.3% | -0.6% | ||
| -10.2% | -12.4% | -22.1% | -132.8% | 8.4% | 16.0% | -6.8% | 1.6% | -6.3% | -31.2% | -0.5% | -0.4% | -0.1% | ||
| - | - | - | - | - | - | -3.71 | 66.90 | -48.84 | -33.14 | -0.56 | 1.00 | 5.13 | ||
| 1939 days | 541 days | - | 2 days | 6659 days | - | 4767 days | 70 days | 39049 days | 29 days | 17696649 days | - | - | ||
| 291 days | 427 days | 582 days | 82 days | 70 days | 166 days | 264 days | 141 days | 116 days | 23 days | 75 days | 94 days | 91 days |
EBIT margin. Not meaningful: turnover is only a small part of operating income.
Debt to equity is not shown because equity is negative. Debt divided by negative equity means nothing.
A Belgian filing has no cash-flow statement. Cash flow is therefore an approximation, derived from the income statement. Investment is the acquisitions in the notes and, without them, the balance-sheet move.
| Item | 2025 | 2024 | 2023 | 2022 | 2021 |
|---|---|---|---|---|---|
| Overdue tax debts | - | - | - | €157,065 | - |
Source: notes to the 2021 to 2025 annual accounts (statement of debts)
| Item | 2025 | 2024 | 2023 | 2022 | 2021 |
|---|---|---|---|---|---|
| Mortgages, amount registered | - | €1.6m | €114.6m | €114.6m | €114.6m |
| €114.6m | - | - | - | - | |
| Carrying value of the mortgaged assets | - | - | €1.6m | €2.4m | €6.6m |
Source: notes to the 2021 to 2025 annual accounts (statement of debts and off-balance-sheet rights and commitments)
| Item | 2025 | 2024 | 2023 | 2022 | 2021 |
|---|---|---|---|---|---|
| Fee for the audit | €4,752 | €4,752 | €4,688 | €4,250 | €4,000 |
| Other work by the auditor | €1,050 | €1,050 | €1,050 | €1,000 | €1,000 |
Source: notes to the 2021 to 2025 annual accounts (relations with the auditor)
The operating result for 2025 is a loss of €113,818, larger than the loss of €33,031 in 2024.
Equity is negative. Debt (€10.6m) exceeds the balance-sheet total (€3.9m).
Source: lists of holdings in the owners' accounts
Source: list of holdings in the 2025 accounts of . Holdings that file themselves stand with their latest accounts, the others with the amounts of that list, in their own currency.
via , no longer at · Managing director · deed of 02-05-2023 founded in 2013 · negative equity (2025) |
258 FTE (2025) |
via (at CONSTRUCT ME, last mentioned in 2018), (at CONSTRUCT ME until 2025) and 4 others · deeds of 13-02-2023 and 05-02-2020 founded in 2020 · negative equity (2025) |
turnover €500,156 (2025) |
via (at CONSTRUCT ME until 2025), (at CONSTRUCT ME until 2019) and (at CONSTRUCT ME until 2022) · deeds of 27-01-2023, 31-03-2022 and 03-01-2018 founded in 2007 · negative equity (2025) |
total assets €4.7m (2025) |
via (at CONSTRUCT ME, last mentioned in 2018), (no longer at ) and 4 others · deeds of 31-03-2022 and 31-12-2018 founded in 2015 · negative equity (2025) |
total assets €4.2m (2025) |
via (at CONSTRUCT ME until 2019) and (at CONSTRUCT ME until 2022) · Director · deed of 03-01-2018 founded in 2009 · negative equity (2025) |
turnover €551,811 (2025) |
via (at CONSTRUCT ME until 2025), (at CONSTRUCT ME until 2019) and (at CONSTRUCT ME until 2022) · deeds of 27-01-2023, 01-03-2022 and 03-01-2018 founded in 2016 · negative equity (2025) |
total assets €3.1m (2025) |
via , at CONSTRUCT ME until 2025 · Director · deed of 05-01-2021 founded in 2012 |
total assets €82.6m (2025) |
via (at CONSTRUCT ME until 2019) and (at CONSTRUCT ME until 2022) · Director · deeds of 17-09-2019 and 03-01-2018 founded in 1983 |
turnover €5.3m (2025) |
via (at CONSTRUCT ME, last mentioned in 2018), (at CONSTRUCT ME until 2019) and (at CONSTRUCT ME until 2022) · Director · deed of 20-12-2018 founded in 2018 |
total assets €19.7m (2019) |
via (at CONSTRUCT ME until 2019) and (at CONSTRUCT ME until 2022) · deeds of 01-03-2022 and 03-01-2018 founded in 2014 |
total assets €19.5m (2025) |
via (at CONSTRUCT ME until 2019) and (at CONSTRUCT ME until 2022) · Director · deeds of 28-12-2021 and 09-04-2019 founded in 1995 |
total assets €11.2m (2025) |
via (no longer at ), (no longer at ) and 3 others · Director · deed of 04-04-2022 founded in 2019 |
total assets €2.1m (2025) |
via , at CONSTRUCT ME until 2022 · Director · deed of 12-02-2021 founded in 2009 |
total assets €1.7m (2025) |
via (at CONSTRUCT ME until 2019) and (at CONSTRUCT ME until 2022) · Manager · deed of 03-01-2018 founded in 2010 |
total assets €565,710 (2025) |
via , at CONSTRUCT ME until 2025 · Director · deed of 15-03-2024 founded in 2011 |
total assets €455,822 (2025) |
via , at CONSTRUCT ME until 2025 · Director · deed of 31-03-2016 |
founded in 2016 |
via , no longer at · Administrateuretadministrateur délégué · deed of 02-05-2023 No longer active |
104 FTE (2024) |
via (at CONSTRUCT ME until 2019) and (at CONSTRUCT ME until 2022) · Manager · deed of 18-01-2018 No longer active |
turnover €456,487 (2021) |
via (at CONSTRUCT ME until 2025), (at CONSTRUCT ME until 2019) and (at CONSTRUCT ME until 2022) · deeds of 13-02-2023, 28-12-2021 and 03-01-2018 No longer active |
turnover €455,928 (2024) |
via (at CONSTRUCT ME until 2019) and (at CONSTRUCT ME until 2022) · Manager (not named in the articles) · deed of 26-10-2018 No longer active |
turnover €182,373 (2021) |
via (at CONSTRUCT ME until 2025), (at CONSTRUCT ME until 2019) and (at CONSTRUCT ME until 2022) · deeds of 27-01-2023, 31-03-2022 and 03-01-2018 No longer active · founded in 2009 |
turnover €455,497 (2025) |
via (at CONSTRUCT ME until 2019) and (at CONSTRUCT ME until 2022) · Manager · deed of 03-01-2018 No longer active |
turnover €138,857 (2022) |
via , at CONSTRUCT ME until 2019 · Director · deed of 03-01-2018 No longer active |
total assets €980,428 (2020) |
via (at CONSTRUCT ME until 2019) and (at CONSTRUCT ME until 2022) · deeds of 31-03-2022 and 03-01-2018 No longer active |
total assets €181,590 (2022) |
via , at CONSTRUCT ME until 2019 · Manager · deed of 03-01-2018 No longer active |
total assets €162,048 (2020) |
Deadline for the 2026 accounts: 31-07-2027
Financial milestones sit on the financial year-end date, not the filing date.
Sources: Publications in the Belgian Official GazetteFilings with the National Bank
| Establishment | Since | Unit number |
|---|---|---|
| Drève Richelle 161 Bât.D registered office 1410 Waterloo | ||
| Les Papeteries de Genval Avenue Jean Mermoz 1, 6041 Charleroi 42990 Civil engineering | 09-10-2012 | 2.213.158.730 |
| Cadastral parcel | Area | Buildings | Height / floors |
|---|---|---|---|
| 52028B0299/04G000 | 7,777 m² | 1 · 1,849 m² | 10.7 m · 3 |
Check the withholding obligation If you pay this company for building or cleaning work, check before every payment whether you must withhold part of the invoice. Use the enterprise number 0848.550.951
If something looks wrong or is missing, please tell us.