Skip to content

MECOTEC: employer check

MECOTEC (Mons) averaged 63 full-time equivalents in fiscal year 2024. Is the workforce growing, do people stay, and how does the employer compare with its sector?

MECOTEC
BE 0699.531.237MonsNACE 71.121, Engineering and related technical consultancy, excluding land surveyors
Social balance 2024 · full schemaOther company
Staff
62.7 FTE
62 people on 31-12-2024+28% on 2023
Sector median 3.2 FTEhighest quarter
Turnover
40%
30 joined, 25 left
Sector median 23%middle half
Staff cost per FTE
€60,300
fiscal year 2024 · cost to the employer, not a salary
Sector Higher than 4% of employers in Architecture and engineering with 50 to 249 FTE
Training
25.2 hours per FTE
1,581 hours in total · €68,300
Sector 37% report trainingmedian 19.6 hmiddle half

Staff cost per FTE over the years

euro per full-time equivalent

From 2019 to 2024 the staff cost per FTE rose by 8%. The sector's median is €80,400.

Highest staff cost per FTE in Architecture and engineering

Staff over the years

average FTE

From 2019 to 2024 staff grew by 62%. Years before the social balance in this form come from the accounts themselves.

Entries and exits

joinedleft

Make-up on 31-12-2024

62 people
Full-time and part-timesector: 14% part-time
full-time 54 (87%)part-time 8 (13%)
Men and womensector: 26% women
men 57 (92%)women 5 (8%)
Type of contractsector: 100% permanent
permanent 62 (100%)
Job category
white-collar 62 (100%)

Training in 2024

ParticipantsHoursCost
Formal - - €1,100
Less formal 38 592 €59,200
Initial 1 989 €8,000

Training cost is 1.8% of personnel cost.

Every figure per fiscal year

as filed
2021202220232024
Average staff (FTE)34.740.548.862.7
Full-time / part-time (average)29.4 / 7.834.3 / 943.3 / 7.957.7 / 7.3
People at the closing date39505762
Hours worked58,51965,51980,812102,004
Personnel cost€1,887,300€2,354,500€2,904,300€3,778,200
Joined (people)12181630
Left (people)77925
Exit rate20%17%18%40%
Training hours-5881761,581

Employer stability

  • Status Active; no open bankruptcy or judicial reorganisation.
  • Financial health Checked score 39/100 (weak), accounts 2024
  • Filing of accounts The accounts for 2025 are still missing; the legal deadline has passed.
  • In business since 03-07-2018 (8 years)

How to read these figures

  • Source: the social balance in the annual accounts the company filed with the National Bank of Belgium. It covers its own staff, not that of its subsidiaries.
  • Personnel cost is the employer's total cost (gross pay, employer contributions, insurance and other benefits), not an employee's pay.
  • The staff costs of the annual accounts (item 62) divided by the average staff in full-time equivalents of the same fiscal year: what one full-time employee costs the employer, social contributions included. Neither a gross nor a net salary.
  • The sector is the NACE division of the main activity. Percentages are compared with employers of at least 5 FTE; the middle half runs from the first to the third quartile.
  • Exits are the number of leavers in full-time equivalents against average staff. Students, flexi-jobs and seasonal work are included and can make the percentage high.