TCM CONSTRUCT CONCEPT
The file of TCM CONSTRUCT CONCEPT contains 1 judicial reorganisation, as published in the Belgian State Gazette. The computed 12-month bankruptcy probability is ≥ 25% (high). No processed annual-account figures are available; this conclusion rests on registry and State Gazette data only.
| Active | 4 yrs |
| Locations | 1 |
| Publications | 3 |
Statistical estimate based on public sources — not credit advice nor a finding of fact. How do we compute this?
| Fiscal year | Type | Filed | Reference |
|---|---|---|---|
| 31-03-2025 | volledig | 30-10-2025 | 2025-00563531 |
| 31-03-2024 | volledig | 19-12-2024 | 2024-00621714 |
| 31-03-2023 | volledig | 25-10-2023 | 2023-00495213 |
| 31-03-2022 | micro | 20-10-2022 | 2022-20468023 |
| NACE primary | Construction of buildings(41001) |
| Legal form | Private limited company(610) |
| Incorporation | 02-07-2021 |
| Status | Active |
| Postal code | 5640 |
| First BS signal | 05-05-2026 |
| Latest BS signal | 05-05-2026 |
Parcels linked to this company through its CBE addresses (seat, establishment units, branches), cross-referenced with the cadastral parcel plan. This shows where the company operates — not a deeds register.
| Parcel (capakey) | Region | Area | Buildings | Height / fl. |
|---|---|---|---|---|
| 92087H0017/00G000 | Wallonia | 1,724 m² | 1 · 178 m² | — |
| 92013B0440/00B015 | Wallonia | 1,036 m² | 1 · 131 m² | — |
A single timeline of everything that happened to this company — publications, insolvency and lifecycle events, administrative changes and filed annual accounts.
11-09-2025 Registered office moved
Technical details
{
"events": [
{
"kind": "zetel_transfer",
"seat_type": "siege_social",
"new_address": {
"raw": "rue Albert 1er 1.",
"city": null,
"region": null,
"street": "Albert 1er",
"country": "BE",
"postcode": null,
"box_number": null,
"street_number": "1",
"locality_suffix": null
},
"old_address": {
"raw": "RUE DU NOECHAMPS 42 BTE A",
"city": "METTET",
"region": "waals_gewest",
"street": "RUE DU NOECHAMPS",
"country": "BE",
"postcode": "5640",
"box_number": "A",
"street_number": "42",
"locality_suffix": null
},
"effective_date": "2025-09-02",
"evidence_quote": "",
"region_changed": true,
"is_statute_change": true,
"nationality_change": false,
"old_address_source": "header_volledig_adres",
"statute_clause_text": null,
"statute_article_number": null,
"effective_date_qualifier": "absolute",
"statutaire_vs_werkelijke": "statutaire",
"linguistic_region_changed": false,
"court_jurisdiction_changed": true,
"effective_date_is_approximate": false
}
],
"notary": {
"name": null,
"firm_city": null,
"firm_name": null,
"office_city": null,
"is_associated": false
},
"act_meta": {
"language": "mixed",
"pub_date": "2025-09-11",
"filing_date": "2025-09-02",
"act_kind_objet": "Objet de l\u0027acte:"
},
"decision": {
"body": "algemene_vergadering",
"date": "2025-02-01",
"unanimous": null
},
"subject_company": {
"kbo": "0770.687.269",
"name_full": "TCM CONSTRUCT CONCEPT",
"legal_form": "SRL"
},
"publication_proxy": {
"kind": "person",
"org_kbo": null,
"org_name": null,
"person_name": "MANOLIAKIS THOMAS",
"org_rep_person_name": null,
"person_role_at_subject": "ADMINISTRATEUR"
},
"co_filed_documents": [
"Bijlagen bij het Belgisch Staatsblad-11/09/2025- Annexes du Moniteur belge"
]
}21-03-2024 Aydin Sefer appointed as director (executive)
- Aydin Sefer — Directeur
Technical details
{
"events": [
{
"kind": "director_in",
"role": "directeur",
"person": {
"rrn": "86.12.06-357.92",
"name": "Aydin Sefer",
"address": "6250 Rosselies ruen du Tienne 14bte1",
"birth_date": null,
"profession": "directeur technique",
"birth_place": null
},
"reason": null,
"subkind": "regular",
"via_org": null,
"statutory": null,
"compensated": null,
"effective_date": "2024-02-01",
"evidence_quote": "En date du 1 f\u00E9vrier 2024, l\u0027assembl\u00E9e g\u00E9n\u00E9rale d\u00E9cide d\u0027accepter la nomination de monsieur Aydin Sefer (NN 86.12.06-357.92) domicili\u00E9 \u00E0 6250 Rosselies ruen du Tienne 14bte1 comme directeur technique.",
"decharge_status": null,
"mandate_duration": null,
"rep_rotation_new_rep": null,
"rep_rotation_old_rep": null,
"effective_date_qualifier": null
}
],
"notary": {
"name": null,
"firm_city": null,
"firm_name": null,
"office_city": "Li\u00E8ge",
"is_associated": false
},
"act_meta": {
"language": "fr",
"pub_date": "2024-03-21",
"filing_date": "2024-03-12",
"act_kind_objet": "Objet de l\u0027acte:"
},
"decisions": [
{
"body": "algemene_vergadering",
"date": "2024-02-01",
"unanimous": null
}
],
"is_correction": false,
"subject_company": {
"kbo": "0770.687.269",
"name_full": "TCM CONSTRUCT CONC\u0415\u0420\u0422",
"legal_form": "SRL"
},
"publication_proxy": {
"kind": "person",
"org_kbo": null,
"org_name": null,
"person_name": "MANOLIAKIS THOMAS",
"org_rep_person_name": null,
"person_role_at_subject": "ADMINISTRATEUR"
},
"co_filed_documents": [],
"corrected_publication_numac": null
}Generate a structured, factual brief from every signal in this dossier: risk, financial health, ownership, mandates and sector comparison.
| Legal nameFR | TCM CONSTRUCT CONCEPT |