SUMPROJECT ARCHITECTURE & ENGINEERING
Board
2 directors, last change in 2023Chair of the board and director
chair of the board in office according to the deed of 05-08-2011
director current term since 25-09-2019
listed in the 2025 annual accounts, filed on 25-06-2026
Director (not named in the articles)
since 25-09-2019
term without a fixed end
listed in the 2025 annual accounts, filed on 25-06-2026
- Signing authorityThe articles say who may bind the company, for example by signing a contract.
- “2. Iedere bestuurder is afzonderlijk bevoegd om de vennootschap in en buiten rechte te vertegenwoordigen. In alle akten die de…”deed of 21-04-2023
Mandates through the years
6 names, the dashed line is todayChair of the board, Director
Director (not named in the articles)
Director
Director
Director
Director
LeadershipBoardEarliermandate already running before its first mentionend not dated
Mandates as a list
-
- Chair of the board, since before 05-08-2011
- Director, since before 14-04-2015
-
- Director (not named in the articles), from 25-04-2019 to date
-
- Director, appointed by deed of 07-07-2011, until 31-12-2021
-
- Managing director, until 05-08-2011
- Director, until 31-10-2011
-
- Director, from before 07-07-2011, no longer listed in the 2025 annual accounts
-
- Director, from before 07-07-2011, no longer listed in the 2025 annual accounts
Control
Capital
- Contribution
- €104,475.29
- Source
- 2025 annual accounts
Articles of association
deed of 21-04-2023 (in Dutch)- DurationMost companies exist for an unlimited period, until they are dissolved.
- Unlimited
- Board ruleThese rules set how the board is made up, meets and takes decisions.
- At least 1 director
- Annual meetingThe shareholders approve the annual accounts, among other things, at the annual meeting.
- Third Saturday of April at 10:00
- Liquidation ruleIn a liquidation the creditors are paid first. What is left goes to the shareholders.
- “Enkel natuurlijke personen gerechtigd beroep van architect uit te oefenen en ingeschreven op één van tabellen van Orde van Architecten”“Geen lopende opdrachten meer dan wel overdracht alle overeenkomsten met betrekking tot lopende opdrachten aan derde architect”