OLIVIER CONSTRUCT
ActiveSummary
The computed 12-month bankruptcy probability of OLIVIER CONSTRUCT is 1.8% (moderate). The 2024 annual accounts show equity of €4.9m and a net result of €222,699. Equity remains stable across the filed financial years (±2.5% per year). Its solvency ranks better than 62% of 3,536 sector peers (NACE 43, financial year 2024). The company has been active since 1970 and the Belgian Official Gazette contains no insolvency or warning signals.
Overview
- Staff
- 53 FTE
- Equity
- €4.9m
- Profit
- €222,699
- Parent
- OLIVIER INVEST · 96.67%
- Holdings
- 1
- Olivier Management BVManaging director · permanent representative Yves Olivier
- Valerie HochepiedDirector
Why 55raises riskFigures for financial year 2024 (filed 18-07-2025)Liquidity: current ratio 1.41, cash €192,023Sector: Specialised construction activities (NACE 43)lowers riskFounded in 1970Show the evidence
Checked score
About 2 in 100 comparable companies go bankrupt within 12 months (an estimate).
How it is calculated
The band follows from the bankruptcy probability, on a scale where 10 more points roughly halve it:
| 75-100 | Excellent | under 0.55% |
| 60-74 | Healthy | 0.55% to 1.5% |
| 45-59 | Fair | 1.5% to 4.2% |
| 25-44 | Weak | 4.2% to 15.0% |
| 0-24 | Critical | over 15.0% |
Where the company stands within its band depends half on the bankruptcy probability and half on how it does against its sector peers (NACE 43, medium-sized): better than 76% on solvency, 49% on liquidity, 42% on profitability and 35% on growth.
The bankruptcy probability was computed on 28-10-2026 by the bankruptcy model of 2 October 2026, which learns from Belgian bankruptcies and reads the registers, the annual accounts and the Belgian Official Gazette.
Some facts cap the score, however low the probability. Negative or zero equity, a heavy loss, a special status in the KBO, one missing filing or accounts filed more than 90 days late hold it at Fair at most (59); two missing filings, at Weak (44). An ongoing judicial reorganisation or the company's end (bankruptcy, dissolution, liquidation) holds it at Critical at most (24).
Credit check for your own amount and term
Show the recommended maximum and see how the verdict changes with amount, term and advance.
Signals
This company filed its last 6 accounts on average 6 days before the deadline; the sector median (NACE 43) for financial year 2024 is 1 day before the deadline, and 43% of those companies filed late.
Searched, nothing found (1)
- Reappointment: POUSEELE CARON BEDRIJFSREVISOREN (statutory auditor)Permanent representative: Franky CARON
- Reappointments: Olivier Management BV (director) and…Permanent representative: Yves Olivier ·…
- Annual accounts filedfinancial year 2024 · full…
Financials · financial year 2024, full format
2025 annual accounts not yet filed, deadline passed on 31 July 2026 Financial year closed on 31 December 2025; filing due at the latest 7 months after the close (Companies Code art. 3:10). Source: NBB filings, as of 29 October 2026.
2020 to 2024, 5 financial years 2019 to 2024, 6 financial years
The operating result falls in 2024; 2024 is 13% below 2023.
What the company sold each financial year and what was left of it. A loss stands below the zero line.
What the company owns (total assets), how much of it is its own (equity) and how much it owes.
Short-term assets minus short-term debts. Above zero the company can pay its bills in the short term.
How much of each euro of turnover is left from operations (EBIT margin) and what the assets earn (return on assets).
The share of the company financed with its own means. The higher it is, the better it absorbs a shock.
Short-term assets per euro of short-term debt. Above 1 the short-term debts are covered.
Average staff in full-time equivalents (FTE).
Use the arrow keys on the chart for the figures per year.
Sector: the middle half of NACE 43, Specialised construction activities: a quarter of companies sit below it, a quarter above. Each year compared with accounts in the same format, and only where there are at least 30. Dashed line: the median. Available for Net result, Equity, Total assets, Working capital, Solvency, Current ratio, Return on assets (ROA), Staff (FTE).
- 2021 Net result +68% on 2020. The previous financial year ran 16 months, this one 12.
- 2020 Net result -1,964% on 2019. This financial year ran 16 months, the previous one 12.
Peer companies
Historical observationOf the 1,887 companies that looked in July 2024 the way this one looks now, 0.1% went bankrupt within 24 months and 97.9% are still going.
- Medium-sized
- 20 years or older
- solvency 30% or more
- a profit under 5% of the balance sheet
For this company itself Checked computes a higher bankruptcy probability: 1.8% over twelve months. The score reads more about this company than the group's four characteristics; both figures are right about what they measure.
How reliable is this rule?
Tested on the year before, without using that year itself: the groups of July 2023 gave each of the 497,445 companies of July 2024 its group's bankruptcy share. Expected: 1.6%; actually bankrupt within 24 months: 1.7%.
| Group | Expected | Actual |
|---|---|---|
| 1 | 0.2% | 0.2% |
| 2 | 0.3% | 0.5% |
| 3 | 0.5% | 0.6% |
| 4 | 0.7% | 0.8% |
| 5 | 0.9% | 0.9% |
| 6 | 1.3% | 1.5% |
| 7 | 1.6% | 1.8% |
| 8 | 1.8% | 1.8% |
| 9 | 3.0% | 3.1% |
| 10 | 5.6% | 6.2% |
The rule ranks well: a company that went bankrupt got a higher share than one that kept going in 74.5% of comparisons. The level follows the economy: in a year with more bankruptcies, the actual share is higher than the year before.
An observation about 1,887 comparable companies, not a prediction for this company. The sector does not count: the register keeps no sector for companies that stopped, so it would make the outcome look better than it was.
| Line | 2019 | 2020 | 2021 | 2022 | 2023 | 2024 | Change |
|---|---|---|---|---|---|---|---|
| Operating income70/76A | - | - | €21.0m | €19.3m | €20.5m | €19.9m | ▼ 2.8% |
| Turnover70 | €23.3m | €31.2m | €20.8m | €18.8m | €20.4m | €19.5m | ▼ 4.7% |
| Change in stocks of work in progress, finished goods and contracts in progress71 | - | - | -€0.1m | €0.2m | -€0.2m | €0.2m | - |
| Other operating income74 | - | - | €0.3m | €0.3m | €0.3m | €0.3m | ▲ 1.6% |
| Operating charges60/66A | - | - | €21.5m | €19.1m | €20.2m | €19.7m | ▼ 2.6% |
| Goods for resale, raw materials and consumables60 | - | - | €15.0m | €12.5m | €13.8m | €13.2m | ▼ 4.7% |
| Purchases600/8 | - | - | €15.1m | €12.7m | €13.8m | €13.2m | ▼ 4.4% |
| Change in stocks: decrease (increase)609 | - | - | -€0.04m | -€0.2m | €0.02m | -€0.03m | - |
| Services and other goods61 | - | - | €1.8m | €1.8m | €2.0m | €2.0m | ▼ 1.3% |
| Remuneration, social security and pensions62 | - | - | €3.9m | €4.0m | €3.7m | €3.9m | ▲ 4.5% |
| Depreciation of and write-downs on formation expenses, intangible and tangible fixed assets630 | €0.9m | €1.2m | €0.8m | €0.7m | €0.6m | €0.6m | ▼ 2.3% |
| Write-downs on stocks, contracts in progress and trade receivables: additions (reversals)631/4 | - | - | €0.2m | -€0.09m | €0.008m | €0.002m | ▼ 80.7% |
| Provisions for liabilities and charges: additions (uses and reversals)635/8 | - | - | -€0.3m | €0.005m | €0.03m | €0.02m | ▼ 43.2% |
| Other operating charges640/8 | - | - | €0.09m | €0.09m | €0.08m | €0.09m | ▲ 17.7% |
| Operating profit (loss)9901 | €0.08m | -€1.6m | -€0.5m | €0.2m | €0.3m | €0.2m | ▼ 13.3% |
| Financial income75/76B | - | - | €0.05m | €0.6m | €0.08m | €0.07m | ▼ 10.5% |
| Recurring financial income75 | €0.07m | €0.07m | €0.05m | €0.6m | €0.08m | €0.07m | ▼ 10.5% |
| Income from financial fixed assets750 | - | - | - | €0.5m | €0 | - | - |
| Income from current assets751 | - | - | €0.01m | €0.003m | €0.008m | €0.03m | ▲ 231% |
| Other financial income752/9 | - | - | €0.04m | €0.04m | €0.07m | €0.04m | ▼ 38.4% |
| Financial charges65/66B | - | - | €0.09m | €0.08m | €0.08m | €0.09m | ▲ 4.9% |
| Recurring financial charges65 | €0.1m | €0.2m | €0.09m | €0.08m | €0.08m | €0.09m | ▲ 4.9% |
| Debt charges650 | €0.09m | €0.08m | €0.04m | €0.03m | €0.03m | €0.06m | ▲ 97.0% |
| Other financial charges652/9 | - | - | €0.05m | €0.05m | €0.05m | €0.03m | ▼ 45.9% |
| Profit (loss) for the period before taxes9903 | €0.02m | -€1.7m | -€0.6m | €0.7m | €0.3m | €0.2m | ▼ 18.0% |
| Transfer from deferred taxes780 | - | - | €0.006m | €0.006m | €0.004m | €257 | ▼ 93.4% |
| Income taxes67/77 | €0.1m | €0.005m | €0.003m | €0.008m | €0.003m | €0.003m | ▲ 2.1% |
| Taxes670/3 | - | - | €0.003m | €0.008m | €0.003m | €0.003m | ▲ 2.1% |
| Profit (loss) for the period9904 | -€0.08m | -€1.7m | -€0.6m | €0.7m | €0.3m | €0.2m | ▼ 19.3% |
| Transfer from tax-exempt reserves789 | - | - | €0.01m | €0.01m | €0.008m | €0.001m | ▼ 93.4% |
| Profit (loss) for the period to be appropriated9905 | -€0.07m | -€1.7m | -€0.6m | €0.7m | €0.3m | €0.2m | ▼ 21.3% |
| Line | 2019 | 2020 | 2021 | 2022 | 2023 | 2024 | Change |
|---|---|---|---|---|---|---|---|
| Assets | |||||||
| Total assets20/58 | €13.9m | €12.1m | €11.0m | €9.8m | €10.2m | €10.0m | ▼ 1.8% |
| Formation expenses20 | €0.007m | €0.002m | - | - | - | - | - |
| Fixed assets21/28 | €5.9m | €5.2m | €5.1m | €4.5m | €4.6m | €4.8m | ▲ 5.0% |
| Intangible fixed assets21 | €0.02m | €0.04m | €0.03m | €0.03m | €0.04m | €0.03m | ▼ 30.6% |
| Tangible fixed assets22/27 | €5.1m | €4.4m | €4.2m | €3.7m | €3.8m | €4.0m | ▲ 6.4% |
| Plant, machinery and equipment23 | - | - | €0.7m | €0.6m | €0.6m | €0.6m | ▲ 5.5% |
| Furniture and vehicles24 | - | - | €0.08m | €0.08m | €0.2m | €0.2m | ▼ 6.0% |
| Leasing and similar rights25 | - | - | €3.5m | €3.1m | €3.0m | €3.2m | ▲ 7.3% |
| Financial fixed assets28 | €0.8m | €0.8m | €0.8m | €0.8m | €0.8m | €0.8m | = |
| Affiliated companies280/1 | - | - | €0.6m | €0.6m | €0.6m | €0.6m | = |
| Participating interests280 | - | - | €0.6m | €0.6m | €0.6m | €0.6m | = |
| Other financial fixed assets284/8 | - | - | €0.2m | €0.2m | €0.2m | €0.2m | ▲ 0.1% |
| Amounts receivable and cash guarantees285/8 | - | - | €0.2m | €0.2m | €0.2m | €0.2m | ▲ 0.1% |
| Current assets29/58 | €8.0m | €6.9m | €5.9m | €5.3m | €5.6m | €5.2m | ▼ 7.4% |
| Stocks and contracts in progress3 | €0.5m | €0.5m | €1.2m | €1.8m | €1.6m | €1.8m | ▲ 15.5% |
| Stocks30/36 | - | - | €0.5m | €0.7m | €0.7m | €0.7m | ▲ 5.4% |
| Raw materials and consumables30/31 | - | - | €0.3m | €0.5m | €0.5m | €0.5m | ▲ 6.7% |
| Property held for sale35 | - | - | €0.2m | €0.2m | €0.2m | €0.2m | ▲ 2.2% |
| Contracts in progress37 | - | - | €0.7m | €1.1m | €0.9m | €1.1m | ▲ 23.2% |
| Amounts receivable within one year40/41 | €4.4m | €4.3m | €3.6m | €2.6m | €3.2m | €2.7m | ▼ 13.6% |
| Trade receivables40 | - | - | €3.2m | €2.4m | €2.9m | €2.0m | ▼ 29.2% |
| Other amounts receivable41 | - | - | €0.4m | €0.3m | €0.3m | €0.7m | ▲ 125% |
| Current investments50/53 | €0.1m | €0.1m | €0.1m | €0.1m | €0.4m | €0.3m | ▼ 12.8% |
| Own shares50 | - | - | €0.1m | €0.1m | €0.1m | €0.1m | = |
| Other investments51/53 | - | - | - | - | €0.3m | €0.2m | ▼ 19.7% |
| Cash at bank and in hand54/58 | €1.4m | €0.9m | €0.9m | €0.7m | €0.4m | €0.2m | ▼ 47.7% |
| Deferred charges and accrued income490/1 | - | - | €0.09m | €0.07m | €0.09m | €0.08m | ▼ 4.6% |
| Equity and liabilities | |||||||
| Total equity and liabilities10/49 | €13.9m | €12.1m | €11.0m | €9.8m | €10.2m | €10.0m | ▼ 1.8% |
| Equity10/15 | €6.2m | €4.4m | €3.9m | €4.6m | €4.8m | €4.9m | ▲ 3.6% |
| Contributions10/11 | €0.5m | €0.5m | €0.5m | €0.5m | €0.5m | €0.5m | = |
| Capital10 | - | - | €0.5m | €0.5m | €0.5m | €0.5m | = |
| Issued capital100 | - | - | €0.5m | €0.5m | €0.5m | €0.5m | = |
| Reserves13 | €5.7m | €3.9m | €3.4m | €4.1m | €4.3m | €4.4m | ▲ 4.0% |
| Non-distributable reserves130/1 | - | - | €0.2m | €0.2m | €0.2m | €0.2m | = |
| Legal reserve130 | - | - | €0.05m | €0.05m | €0.05m | €0.05m | = |
| Own shares acquired1312 | - | - | €0.1m | €0.1m | €0.1m | €0.1m | = |
| Tax-exempt reserves132 | - | - | €0.3m | €0.3m | €0.3m | €0.3m | ▼ 0.2% |
| Distributable reserves133 | - | - | €2.9m | €3.6m | €3.8m | €4.0m | ▲ 4.5% |
| Provisions and deferred taxes16 | €0.1m | €0.4m | €0.2m | €0.2m | €0.2m | €0.2m | ▲ 8.5% |
| Provisions for liabilities and charges160/5 | - | - | €0.2m | €0.2m | €0.2m | €0.2m | ▲ 8.6% |
| Other liabilities and charges164/5 | - | - | €0.2m | €0.2m | €0.2m | €0.2m | ▲ 8.6% |
| Deferred taxes168 | - | - | €0.01m | €0.004m | €257 | €0 | ▼ 100% |
| Amounts payable17/49 | €7.6m | €7.2m | €6.9m | €5.1m | €5.2m | €4.8m | ▼ 7.2% |
| Amounts payable after more than one year17 | €2.9m | €2.1m | €1.8m | €1.3m | €1.2m | €1.2m | ▼ 3.1% |
| Financial debts170/4 | - | - | €1.8m | €1.3m | €1.2m | €1.2m | ▼ 3.1% |
| Leasing and similar obligations172 | - | - | €1.8m | €1.3m | €1.1m | €1.1m | ▼ 3.3% |
| Credit institutions173 | - | - | - | - | €0.05m | €0.05m | ▲ 1.5% |
| Amounts payable within one year42/48 | €4.7m | €5.1m | €5.1m | €3.7m | €4.0m | €3.7m | ▼ 8.2% |
| Current portion of amounts payable after more than one year42 | - | - | €0.6m | €0.5m | €0.4m | €0.5m | ▲ 20.3% |
| Financial debts43 | - | - | €0.4m | €0.3m | €0.6m | €0.3m | ▼ 50.6% |
| Credit institutions430/8 | - | - | €0.4m | €0.3m | €0.6m | €0.3m | ▼ 50.6% |
| Trade debts44 | €3.5m | €3.7m | €3.4m | €2.1m | €2.3m | €2.3m | ▲ 3.4% |
| Suppliers440/4 | - | - | €3.4m | €2.1m | €2.3m | €2.3m | ▲ 3.4% |
| Advances received on contracts in progress46 | - | - | €0.2m | €0.6m | €0.3m | €0.1m | ▼ 57.3% |
| Taxes, remuneration and social security45 | - | - | €0.1m | €0.1m | €0.1m | €0.1m | ▲ 1.0% |
| Taxes450/3 | - | - | €0.02m | €0.02m | €0.02m | €0.02m | ▼ 10.6% |
| Remuneration and social security454/9 | - | - | €0.1m | €0.1m | €0.1m | €0.1m | ▲ 2.8% |
| Other amounts payable47/48 | - | - | €0.4m | €0.1m | €0.2m | €0.3m | ▲ 2.6% |
| Accrued charges and deferred income492/3 | - | - | €37 | €40 | €0.01m | €97 | ▼ 99.0% |
| Line | 2019 | 2020 | 2021 | 2022 | 2023 | 2024 | Change |
|---|---|---|---|---|---|---|---|
| Profit (loss) for the period9904 | -€0.08m | -€1.7m | -€0.6m | €0.7m | €0.3m | €0.2m | ▼ 19.3% |
| + Depreciation and write-downs630 | €0.9m | €1.2m | €0.8m | €0.7m | €0.6m | €0.6m | ▼ 2.3% |
| Operating cash flow (approximation) | €0.8m | -€0.5m | €0.3m | €1.4m | €0.9m | €0.8m | ▼ 7.6% |
| Investment in fixed assets (approximation) | - | -€0.5m | -€0.7m | -€0.2m | -€0.7m | -€0.8m | ▼ 19.1% |
| Change in cash | - | -€0.5m | -€0.01m | -€0.2m | -€0.3m | -€0.2m | ▲ 42.0% |
Simplified and derived: a Belgian filing has no cash-flow statement, so these rows come from the income statement and the balance-sheet moves.
Latest 10 of 47 filings with the National Bank
| Financial year | Type | Filed | Reference |
|---|---|---|---|
| 31-12-2024 | full format | 17-07-2025 | 2025-00286166 |
| 31-12-2023 | full format | 18-07-2024 | 2024-00265282 |
| 31-12-2022 | full format | 14-07-2023 | 2023-00237168 |
| 31-12-2021 | full format | 15-07-2022 | 2022-20190774 |
| 31-12-2020 | full format | 31-08-2021 | 2021-63700381 |
| 31-08-2019 | full format | 26-03-2020 | 2020-07700097 |
| 31-08-2018 | full format | 12-03-2019 | 2019-07200360 |
| 31-08-2017 | full format | 28-03-2018 | 2018-08400448 |
| 31-08-2016 | full format | 15-03-2017 | 2017-06300293 |
| 31-08-2015 | full format | 09-02-2016 | 2016-04200245 |
Similar companies · same sector, comparable size
Subsidies and aid
Flemish government
2022 to 2025 · 8 entries · €17,195 awarded · €16,307 paid| Year | Entries | Awarded | Paid |
|---|---|---|---|
| 2025 | 2 | €4,965 | €4,698 |
| 2024 | 2 | €1,492 | €1,492 |
| 2023 | 3 | €9,353 | €9,353 |
| 2022 | 1 | €1,385 | €764 |
Public contracts: No European public contracts awarded found since October 2016. Contracts below the EU thresholds are not in TED.
Directors
Board 2
Day-to-day management 1
Permanent representatives 1
Statutory auditor 1
Not every act has been read: a resignation may still be missing
Mandate history
- Board
- Day-to-day management
- Statutory auditor
- began earlier
| Name | Functions and periods |
|---|---|
| Olivier Management BV |
|
| Valerie Hochepied |
|
| POUSEELE CARON BEDRIJFSREVISOREN |
|
Owners and capital
Owners
1 ownerChain of control
- OLIVIER INVEST
- OLIVIER CONSTRUCT
Highest known parent: OLIVIER INVEST. The sources do not say who stands above it.
Owners 1
- OLIVIER INVESTparent96.67%
According to the 2024 annual accounts of OLIVIER CONSTRUCT and those of the other companies, the acts in the Belgian Official Gazette and the LEI register. Annual accounts state the shareholders that notified the company under article 7:225 of the Code of Companies and Associations and the parent companies that consolidate it. The register of ultimate beneficial owners (UBO) is not public: who ultimately stands behind a natural person or a foreign parent is not stated here. A company that does not include these statements in its annual accounts, or does not have to, is not listed.
Group and network
Holdings and subsidiaries
1 holdingHoldings 1
-
96%
According to the 2024 annual accounts of OLIVIER CONSTRUCT and those of the other companies, the acts in the Belgian Official Gazette and the LEI register. Annual accounts state the shareholders that notified the company under article 7:225 of the Code of Companies and Associations and the parent companies that consolidate it. The register of ultimate beneficial owners (UBO) is not public: who ultimately stands behind a natural person or a foreign parent is not stated here. A company that does not include these statements in its annual accounts, or does not have to, is not listed.
Connections & network
2 current directorsThe network starts from this company’s directors. Other companies they run appear here as nodes.
History
Acts, filings and financial milestones
28-04
Gazette deed
Reappointment: POUSEELE CARON BEDRIJFSREVISOREN (statutory auditor)Permanent representative: Franky CARON3 facts ▸
- General meeting, 08-07-2025
- Auditor reappointment, POUSEELE CARON BEDRIJFSREVISOREN (statutory auditor)
- Permanent representative, Franky CARON
29-08
Gazette deed
Reappointments: Olivier Management BV (director) and Valerie Hochepied (director)Permanent representative: Yves Olivier · Appointment: Olivier Management BV (managing director)6 facts ▸
- General meeting, 10-06-2023
- Director reappointment, Olivier Management BV (director)
- Permanent representative, Yves Olivier
- Director reappointment, Valerie Hochepied (director)
- Board meeting, 10-06-2023
- Director appointment, Olivier Management BV (managing director)
14-12
Gazette deed
Reappointment: BV POUSEELE CARON BEDRIJFSREVISOREN (statutory auditor)Permanent representatives: Franky CARON and Olivier Yves5 facts ▸
- General meeting, 18-06-2022
- Auditor reappointment, BV POUSEELE CARON BEDRIJFSREVISOREN (statutory auditor)
- Permanent representative, Franky CARON (2 times)
- Director in office, Olivier Mariagement BV (managing director)
- Permanent representative, Olivier Yves
Show earlier events
About the unread acts
Of the 14 Belgian Official Gazette deeds we know for this company, 3 have been read. The other 11 have not been read yet: what they contain is neither established nor disproved here.
Register details
If you follow this company, Checked tells you the day it leaves the Peppol register.
Register as of 29 October 2026 · Peppol Directory
Scores and ratios are computed by Checked and are not a credit decision.
Check the withholding obligation If you pay this company for building or cleaning work, check before every payment whether you must withhold part of the invoice, with enterprise number 0407.549.854
Recognitions · licences · registrations
Recognised contractor
36 categories- C General road works contractsclass 7, up to €6,396,000
- C1 Ordinary sewer worksclass 7, up to €6,396,000
- C2 Water supply and laying all kinds of pipesclass 1, up to €162,000
- C3 Non-electric road signs, safety devices, fences and screensclass 1, up to €162,000
- C5 Bituminous paving and surface dressingclass 4, up to €1,080,000
- D General building contractsclass 6, up to €3,870,000
- D1 All shell construction and roofing-in of buildingsclass 6, up to €3,870,000
- D4 Sound and heat insulation, light partitions, false ceilings and floorsclass 1, up to €162,000
Show all 36 categories
- D5 General joinery, timber roof trusses and stairsclass 1, up to €162,000
- D8 Asphalt and similar roof coverings, waterproofingclass 1, up to €162,000
- D10 Tilingclass 1, up to €162,000
- D11 Plastering and renderingclass 1, up to €162,000
- D12 Non-metal, non-asphalt roof coveringsclass 1, up to €162,000
- D14 Glazingclass 1, up to €162,000
- D16 Sanitary installations and gas heating with individual appliancesclass 1, up to €162,000
- D17 Central heating, thermal installationsclass 1, up to €162,000
- D18 Ventilation, warm-air heating and air conditioningclass 1, up to €162,000
- D20 Metal joineryclass 1, up to €162,000
- D21 Cleaning and restoring facadesclass 1, up to €162,000
- D22 Metal roofing and zinc workclass 1, up to €162,000
- D29 Floor screeds and industrial floor coveringsclass 1, up to €162,000
- E General civil engineering contractsclass 6, up to €3,870,000
- E1 Trunk sewersclass 7, up to €6,396,000
- E2 Pile foundations, sheet piling and diaphragm wallsclass 1, up to €162,000
- E4 Horizontal jacking of structural elementsclass 1, up to €162,000
- F General steel construction contractsclass 1, up to €162,000
- F1 Assembly and dismantling (without supplies)class 1, up to €162,000
- F2 Steel load-bearing structuresclass 1, up to €162,000
- G General earthworks contractsclass 6, up to €3,870,000
- G2 Drainage worksclass 1, up to €162,000
- G3 Plantingclass 1, up to €162,000
- G5 Demolitionclass 1, up to €162,000
- H General railway contractsclass 1, up to €162,000
- L2 Pumping and turbine station equipmentclass 1, up to €162,000
- P1 Electrical installations in buildings, with fire and burglar alarms and telecomsclass 1, up to €162,000
- V Water treatment installationsclass 1, up to €162,000
Environmental permits: No permit applications found in Flanders. Brussels and Wallonia do not publish the applicant.
Sites & property
3 establishment units
3 parcels
| Cadastral parcel | Region | Area | Buildings | Height / floors |
|---|---|---|---|---|
| 36494D0108/00N000 | Flanders | 2.5 ha | 1 · 59 m² | 11.3 m · 2 |
| 36009A0494/00D000 | Flanders | 2.0 ha | 1 · 864 m² | 7.1 m · 2 |
| 36494D0108/00M000 | Flanders | 8,765 m² | 1 · 448 m² | 36.0 m · 3 |
How the parcels are linked
Articles of association
- Other provisionsOther rules from the articles that fall under none of the themes above.
- 1 more provision in the deed, see the deed of 29-08-2025
Read from the deeds: 1 provision, deed of 29-08-2025