Skip to content

Integrated Project Support

Active Private limited companyfounded 2022active for 4 yearsSchawijkstraat 55, 2520 RanstKBO/BCE: BE 0791.501.291

Annual accounts 2025

micro format, filed on 29-04-2026, 1 day before the deadline
€84,984
▲ 445%
€81,069
▲ 543%
€56,183
▲ 689%
€83,780
▲ 30.3%
12.4%
▲ 0.5 percentage points
1.13
▼ 0.19

Turnover is estimated at about €180,000, probably between €140,000 and €250,000. The micro format does not state turnover.

Balance sheet

balance sheet total €708,977 on 30-09-2025
What the company ownsHow it is paid for

in euro

in euro

Position in the sector

12.4%

Higher than 16% of the 12,303 companies filing micro accounts in architecture and engineering (NACE 71) in 2025.

1.13

Higher than 26% of the 12,007 companies filing micro accounts in architecture and engineering (NACE 71) in 2025.

7.9%

Higher than 42% of the 12,101 companies filing micro accounts in architecture and engineering (NACE 71) in 2025.

Integrated Project Support Middle half of the sector 80% of the sector Micro accounts in architecture and engineering (NACE 71)

Net result: top quarter · Equity: middle half · Balance sheet total: top quarter · Working capital: middle half

Key figures and ratios

per financial year, computed from the annual accounts
Line Trend202520242023
84,46415,48022,521
59,5799,98716,771
4,5671,3736,216
104,778-31,417-
83,78064,28519,755
12.4%11.9%25.1%
1.131.321.27
7.077.432.98
64.0%22.5%58.4%
7.9%2.7%14.7%
21.685.9217.98

A Belgian filing has no cash-flow statement. Cash flow is therefore an approximation, derived from the income statement. Investment is the acquisitions in the notes and, without them, the balance-sheet move.

Filed annual accounts

as filed with the National Bank, click a year to choose it
Line Trend202520242023
Balance sheet: assets
20/58 708,977266,81997,590
20 -306639
21/28 4,4582,9824,138
22/27 4,4582,9824,138
24 4,4582,9824,138
29/58 704,519263,53192,813
40/41 549,842215,06413,235
40 549,842215,064-
41 --13,235
54/58 152,93948,16279,578
490/1 1,738306-
Balance sheet: equity and liabilities
10/49 708,977266,81997,590
10/15 87,83931,65624,532
10/11 10,20010,20010,200
14 77,63921,45614,332
17/49 621,138235,16373,058
42/48 620,739199,24673,058
42 100,000--
44 470,546191,58171,557
440/4 470,546191,58171,557
45 49,7117,6661,501
450/3 49,7117,6661,501
47/48 482--
492/3 40035,917-
Income statement
9900 84,98415,59822,630
630 3,3962,8632,439
640/8 520118109
9901 81,06912,61620,082
75/76B 103-4
75 103-4
65/66B 3,8962,6161,253
65 3,8962,6161,253
9903 77,27610,00118,834
67/77 21,0932,8774,501
9904 56,1837,12414,332
9905 56,1837,12414,332
Appropriation of the result
9906 77,63921,45614,332
14P 21,45614,332-
Document PDFPDFPDF

The full notes are in the filed accounts (PDF).

Source: Annual accounts 2025 (PDF), filed on 29-04-2026.

Filings

each dot is a set of accounts, on the day it reached the National Bank
Financial year Type Filed Reference Document
30-09-2025 micro format 29-04-2026 2026-00102857 PDF
30-09-2024 micro format 29-04-2025 2025-00086193 PDF
30-09-2023 micro format 29-04-2024 2024-00082627 PDF

Investments

fixed assets acquired
Item30-09-202530-09-202430-09-2023
Tangible fixed assets€4,567€1,373€6,216
€3,396€2,863€2,439

Source: notes to the 2023 to 2025 annual accounts (statement of fixed assets)

Public contracts

2 awards · 2024
Meerjarige overeenkomst (2023-2029) voor de bijstand aan de opvolging van studies en werken betreffende de grote infrastructuurprojecten van Defensie: 23IP999 - 2 NOORDOOST
buyer: Ministerie van DefensieArchitectural, engineering and inspection servicesawarded 04-04-2024€2.7m3 tendersTED 300273-2025
Meerjarige overeenkomst (2023-2029) voor de bijstand aan de opvolging van studies en werken betreffende de grote infrastructuurprojecten van Defensie: 23IP999 - 3 CENTER
buyer: Ministerie van DefensieArchitectural, engineering and inspection servicesawarded 04-04-2024€6.6m2 tendersTED 300273-2025

Source: TED (Tenders Electronic Daily), Publications Office of the European Union. The values are as the buyer published them. For a framework agreement, the value is a ceiling.

Insights on Integrated Project Support

The operating result for 2025 is 6.4 times that of 2024 and the highest since 2023. It is a recovery after the fall in 2024.

Debt's share of the balance-sheet total falls from 88.1% to 87.6%. Equity and debt are higher.

Next steps