The 2024 accounts came in latest, 348 days after the end of the period.
Turnover not published in the abbreviated or micro format
Checked score
Checked score
The higher the Checked score (0 to 100), the smaller the chance that the company goes bankrupt within twelve months. That chance sets the band, from Critical to Excellent, and within the band how the company does against its sector peers counts too. With a low score, agree a shorter payment term, an advance or security.
XXVisible after signing in
HiddenVisible after signing in
Bankruptcy probability within 12 months
Bankruptcy probability
It is the chance that the company goes bankrupt within twelve months, estimated from the registers, the annual accounts and the Belgian Official Gazette. At 0.2%, about 2 in 1,000 comparable companies go bankrupt. The higher it is, the shorter the payment term to agree.
XXVisible after signing in
Financial strength
Financial strength
Financial strength measures the balance sheet and the results with three figures out of 100 from the latest annual accounts: solvency, liquidity and profitability. It does not directly set the Checked score's band. How the company does against its sector peers on these and on growth does count for its place within the band.
XXVisible after signing in
XXVisible after signing in
XXVisible after signing in
Score breakdown
Visible after signing inVisible after signing in
Comparable companies, two years later
In July 2024, 153 companies had the same profile as Global Renewable Energy Mass Adoption Program has now. Each dot is one company, two years later.
96.1%
were still trading
3.9%
stopped another way
0.0%
went bankrupt
Medium-sized
5 to 10 years old
solvency 30% or more
a profit of 5% of the balance sheet or more
Test of the method
The method was tested on the 497,894 companies of July 2024. Each company was given the bankruptcy share of the same profile a year earlier, in July 2023. The expectation was that 1.7% would go bankrupt within 24 months. In fact 1.8% went bankrupt.
The companies in ten equal groups, from the lowest to the highest expected share
Group
Expected
Actual
1
0.2%
0.2%
2
0.4%
0.5%
3
0.6%
0.6%
4
0.7%
0.8%
5
0.9%
1.0%
6
1.4%
1.6%
7
1.7%
1.8%
8
1.9%
2.0%
9
3.1%
3.3%
10
5.9%
6.4%
A company that went bankrupt had a higher expected share than one that kept going in 74.5% of comparisons. The level depends on the economy. In a year with more bankruptcies than the year before, the actual share is higher than the expected one.
This is an observation about 153 companies, not a prediction for Global Renewable Energy Mass Adoption Program. The sector does not count, because the KBO no longer lists a sector for a company that has stopped. By sector, mostly the survivors would count, which would paint too rosy a picture.
Credit verdict
Credit verdict
The credit verdict says how much credit you can give the company on open account. “Acceptable” means normal terms, “With conditions” means limiting the amount or the term. “Not advised” means asking for payment up front.
Visible after signing inVisible after signing in
Credit check for an amount and term of your choice
Name hiddenVisible after signing in (director) and Hidden nameVisible after signing in (director) reappointed
General meeting of 30-06-2026 · Gazette deed
Registered office moved from Brussels to Braine-l'Alleud
The registered office moved from Avenue de Tervueren 402 1150 Bruxelles to Rue Pré Blanche Maison 16, à 1421 Braine-l'-Alleud · Board meeting of 06-02-2026 · Gazette deed
Registered office moved within Brussels
The registered office moved from Avenue Louise 240/14 à 1050 Bruxelles to Avenue de Tervueren 402 à 1150 Bruxelles · General meeting of 14-03-2025 · Gazette deed
19 active companies are registered at this addressOf these, 2 started in the 12 months before 21 November 2026. Source: KBO register, as of 21 November 2026.
Key facts about Global Renewable Energy Mass Adoption Program
What is the company number of Global Renewable Energy Mass Adoption Program?
The company number of Global Renewable Energy Mass Adoption Program is 0743.941.993. The VAT number is the same number with BE in front: BE 0743.941.993.
Where is Global Renewable Energy Mass Adoption Program based?
The registered office is at Rue Pré Blanche Maison 16, 1421 Braine-l'Alleud.Company details
What does Global Renewable Energy Mass Adoption Program do?
According to the KBO register, the main activity of the establishment unit is other membership organisations (NACE 94999).
What is the legal form of Global Renewable Energy Mass Adoption Program?
Global Renewable Energy Mass Adoption Program is a non-profit association (VZW).
When was Global Renewable Energy Mass Adoption Program founded?
Global Renewable Energy Mass Adoption Program was founded on 21-02-2020.
Is Global Renewable Energy Mass Adoption Program still active?
Yes, Global Renewable Energy Mass Adoption Program is an active enterprise in the KBO register.
What is the turnover of Global Renewable Energy Mass Adoption Program?
The annual accounts for financial year 2025 state no turnover. The abbreviated or micro format does not require it. In financial year 2023 turnover was €19,405.Financials
Is Global Renewable Energy Mass Adoption Program profitable?
In financial year 2025, Global Renewable Energy Mass Adoption Program made a profit of €1.5m.
Where can I find the annual accounts of Global Renewable Energy Mass Adoption Program?
Global Renewable Energy Mass Adoption Program filed 4 annual accounts with the National Bank of Belgium, the latest for financial year 2025.
When are the next annual accounts of Global Renewable Energy Mass Adoption Program due?
Global Renewable Energy Mass Adoption Program must file the annual accounts for financial year 2026 by 31-07-2027.Timeline