Skip to content

G-LINE CONSTRUCT

Active
Private limited companyfounded 2016active for 9 yearsChaussée de Tubize 52, 1420 Braine-l'Alleud, BelgiumKBO/BCE: BE 0667.973.771
Summary

G-LINE CONSTRUCT has been active since 2016 and the Belgian Official Gazette contains no insolvency or warning signals. The 2025 annual accounts show equity of €298,170 and a net result of €196,132. Equity is growing by about 26% per year across the filed financial years. Its solvency ranks better than 56% of 1,021 sector peers (NACE 41, financial year 2025). The computed 12-month bankruptcy probability is 0.2% (very low).

Register details

Identification
Legal formPrivate limited company
Founded21-12-2016
Financial year end31-12
Activities, NACEBEL 2025
41001General construction of residential buildings
43990Other specialised construction activities
E-invoicing
Reachable via Peppol
Peppol ID 0208:0667973771
Registered 09-12-2025

If you follow this company, Checked tells you the day it leaves the Peppol register.

Register as of 18 October 2026 · Peppol Directory

Scores and ratios are computed by Checked and are not a credit decision.

Check the withholding obligation If you pay this company for building or cleaning work, check before every payment whether you must withhold part of the invoice, with enterprise number 0667.973.771

Recognitions · licences · registrations

Recognised contractor

22 categories
G-LINE CONSTRUCT SRLapproval no. 40221
  • C1 Ordinary sewer worksclass 1, up to €162,000
  • D General building contractsclass 1, up to €162,000
  • D1 All shell construction and roofing-in of buildingsclass 1, up to €162,000
  • D4 Sound and heat insulation, light partitions, false ceilings and floorsclass 1, up to €162,000
  • D5 General joinery, timber roof trusses and stairsclass 1, up to €162,000
  • D6 Marble and stonemasonryclass 1, up to €162,000
  • D7 Wrought ironworkclass 1, up to €162,000
  • D8 Asphalt and similar roof coverings, waterproofingclass 1, up to €162,000
Show all 22 categories
  • D10 Tilingclass 1, up to €162,000
  • D11 Plastering and renderingclass 1, up to €162,000
  • D12 Non-metal, non-asphalt roof coveringsclass 1, up to €162,000
  • D13 Paintingclass 1, up to €162,000
  • D14 Glazingclass 1, up to €162,000
  • D15 Parquet flooringclass 1, up to €162,000
  • D16 Sanitary installations and gas heating with individual appliancesclass 1, up to €162,000
  • D17 Central heating, thermal installationsclass 1, up to €162,000
  • D18 Ventilation, warm-air heating and air conditioningclass 1, up to €162,000
  • D20 Metal joineryclass 1, up to €162,000
  • D21 Cleaning and restoring facadesclass 1, up to €162,000
  • D22 Metal roofing and zinc workclass 1, up to €162,000
  • D25 Wall and floor coverings other than marble, parquet and tilesclass 1, up to €162,000
  • D29 Floor screeds and industrial floor coveringsclass 1, up to €162,000
decision 16-10-2024

Environmental permits: No permit applications found in Flanders. Brussels and Wallonia do not publish the applicant.

Sites & property

Location & real-estate footprint
Registered office, Braine-l'Alleud · 1 establishment unit since 2016
registered office establishment The establishment unit on the map
Ground area
1.4 ha
Building footprint
219 m²
Building volume
2,389 m³
Parcel 25014A0888/00K000, Wallonia · tallest building 14.9 m. Linked by address, not a title deed.
3 companies at this address See who is registered here
1 establishment unit
G-LINE CONSTRUCT
Chaussée de Tubize 52, 1420 Braine-l'AlleudGeneral construction of residential buildings
since 2016unit no. 2.259.982.907
1 parcel
Wallonia 1 (100%)
Cadastral parcel Region Area Buildings Height / floors
25014A0888/00K000 Wallonia 1.4 ha 1 · 219 m² 14.9 m · 3
How the parcels are linked
Good to know
The parcel matches the address exactly.