CORETEC PROJECTS
Group
CORETEC ENERGY has 7 direct subsidiaries in 2 countries (2025 accounts)Belgium 6 Year Equity Result
- BE Coretec Projects 2025€91,629 result -€4,854 (2025)
- BE CODEL 2025€2.3m result €383,660 (2025)
- BE Coretec Services 2025€1.4m result €468,134 (2025)
- BE Coretec Invoicing 2025€247,573 result €455,343 (2025)
- BE Coretec Energy Management 2025€82,668 result €70,932 (2025)
- BE Coretec Monitoring 2025€76,625 result €902 (2025)
Europe 1 Year Equity Result
- PL Coretec Poland 2019-€80,153 result -€80,272 (2019)
Source: list of holdings in the 2025 accounts of CORETEC ENERGY. Holdings that file themselves stand with their latest accounts, the others with the amounts of that list, in their own currency.
Part of the group CORETEC ENERGY Group, risk and exposureAt the same address
Rue de la Chaudronnerie 14, 4340 Awans · 8 other companies| CORETEC Services
registered office since 26-01-2017 · founded in 2017 · group CORETEC ENERGY |
3.7 FTE (2025) 0670.423.814 |
| COGENFIN
registered office since 01-03-2018 · founded in 2018 |
turnover €4.1m (2025) 0691.652.164 |
| CORETEC ENERGY
registered office since 15-12-2016 · founded in 2016 |
3.8 FTE (2025) 0667.749.186 |
| ENERGYS
registered office since 01-09-2004 · founded in 2004 |
60 FTE (2025) 0866.925.721 |
| CORETEC INVOICING
registered office since 23-09-2010 · founded in 2010 · group CORETEC ENERGY |
3.4 FTE (2025) 0829.505.101 |
| ENERGYS MAINTENANCE
registered office since 21-05-2010 · founded in 2010 |
10 FTE (2025) 0824.920.167 |
| CORETEC MONITORING
registered office since 26-06-2018 · founded in 2018 · group CORETEC ENERGY |
turnover €77,755 (2025) 0698.826.602 |
| COGEN SERVICE
registered office since 29-06-2017 · founded in 2017 |
turnover €68,081 (2025) 0677.717.917 |
Earlier ties
| RAY via JANUS, no longer at RAY · Director · deed of 08-06-2020 Bankrupt |
22 FTE (2019) |
| CORETEC ENGINEERING via FBR Management, at CORETEC PROJECTS until 2025 · Managing director · deed of 17-12-2020 Open bankruptcy · founded in 2004 |
10 FTE (2022) |
| IMMOBERNEAU via FBR Management, at CORETEC PROJECTS until 2025 · Director (not named in the articles) · deed of 20-06-2023 founded in 2016 · negative equity (2025) |
total assets €1.1m (2025) |
| Azimut Energy via FBR Management, at CORETEC PROJECTS until 2025 · Director (not named in the articles) · deed of 23-07-2025 founded in 2023 |
total assets €2.2m (2025) |
| CORETEC INVOICING via FBR Management, at CORETEC PROJECTS until 2025 · Director · deed of 17-12-2020 founded in 2010 · group CORETEC ENERGY |
3.4 FTE (2025) |
| Actyve via FBR Management, at CORETEC PROJECTS until 2025 · Director (not named in the articles) · deed of 26-02-2026 founded in 2024 |
total assets €38,314 (2025) |
Show 1 more earlier tie
| Viabuild Sud via JANUS, no longer at Viabuild Sud · Director · deed of 04-04-2022 No longer active |
73 FTE (2024) |
Connections & network
10 connected companiesThis company
Company
Director
Shareholding
+N: links not shown yet
Click a node to look further, drag to arrange, zoom with the mouse wheel.
Linked via shared directors
CORETEC MAINTENANCE
Open bankruptcy · founded in 2017 · 6.6 FTE (2022)
→
CODEL
Founded in 2003 · turnover €26.8m (2025) · group CORETEC ENERGY
→
CORETEC Services
Founded in 2017 · 3.7 FTE (2025) · group CORETEC ENERGY
→
COGENFIN
Founded in 2018 · turnover €4.1m (2025)
→
Show 6 more companies with a shared director
→
→
→
CORETEC MONITORING
Founded in 2018 · turnover €77,755 (2025) · group CORETEC ENERGY
→
COGEN SERVICE
Founded in 2017 · turnover €68,081 (2025)
→
COGENGREEN
No longer active · founded in 2005 · 12 FTE (2025)
→