Two of the last ten came late. The 2023 accounts came in latest, 25 days after the end of the period.
Checked score
Checked score
The higher the Checked score (0 to 100), the smaller the chance that the company goes bankrupt within twelve months. That chance sets the band, from Critical to Excellent, and within the band how the company does against its sector peers counts too. With a low score, agree a shorter payment term, an advance or security.
XXVisible after signing in
HiddenVisible after signing in
Bankruptcy probability within 12 months
Bankruptcy probability
It is the chance that the company goes bankrupt within twelve months, estimated from the registers, the annual accounts and the Belgian Official Gazette. At 0.2%, about 2 in 1,000 comparable companies go bankrupt. The higher it is, the shorter the payment term to agree.
XXVisible after signing in
Financial strength
Financial strength
Financial strength measures the balance sheet and the results with three figures out of 100 from the latest annual accounts: solvency, liquidity and profitability. It does not directly set the Checked score's band. How the company does against its sector peers on these and on growth does count for its place within the band.
XXVisible after signing in
XXVisible after signing in
XXVisible after signing in
Score breakdown
Visible after signing inVisible after signing in
Credit verdict
Credit verdict
The credit verdict says how much credit you can give the company on open account. “Acceptable” means normal terms, “With conditions” means limiting the amount or the term. “Not advised” means asking for payment up front.
Visible after signing inVisible after signing in
Credit check for an amount and term of your choice
Registered in the Peppol Directory
Reachable for e-invoices through 0208:0455210508
New directorName hiddenVisible after signing in appointed, Hidden nameVisible after signing in resigned · “L’apport de soutien technique à la conception et à la production d’installations, de constructions mécaniques…” (deed in French) · Discharge granted to Name after signing inVisible after signing in · General meeting of 21-06-2023 · Gazette deed
Registered office moved from Sint-Katelijne-Waver to Limal
The registered office moved from Clemenceausteaat, 21 te 2860 Sint-Katelijne-Waver to Félicien Mosraystraat, 9A te 1300 Limal · General meeting of 21-04-2023 · Gazette deed
Name hiddenVisible after signing in appointed as managing director
General meeting of 20-09-2021 · Gazette deed
Sector peers are the companies with the same activity (NACE code) and, where stated, the same size, that the company is compared with. A percentile says how many of them do worse.
These companies have the same main activity as CERESCOR: engineering and related technical consultancy, excluding land surveyors (NACE 71121). They are comparable in size and age: total assets between €1.4m and €2.2m, founded between 1992 and 2001.
According to the KBO register, the main activity is engineering and related technical consultancy, excluding land surveyors (NACE 71121).
What is the legal form of CERESCOR?
CERESCOR is a public limited company (NV).
When was CERESCOR founded?
CERESCOR was founded on 30-05-1995.
Is CERESCOR still active?
Yes, CERESCOR is an active enterprise in the KBO register.
How many employees does CERESCOR have?
CERESCOR had an average of 1 full-time equivalents in financial year 2019, according to the filed annual accounts.Financials
What is the turnover of CERESCOR?
The turnover in financial year 2025 is about €370,000. This figure is estimated from the gross margin of €181,095 and 53 comparable companies (NACE 711). It probably lies between €280,000 and €550,000. In financial year 2022 turnover was €174,061.
Is CERESCOR profitable?
In financial year 2025, CERESCOR made a profit of €72,597.
Where can I find the annual accounts of CERESCOR?
CERESCOR filed 31 annual accounts with the National Bank of Belgium, the latest for financial year 2025.
When are the next annual accounts of CERESCOR due?
CERESCOR must file the annual accounts for financial year 2026 by 31-07-2027.Timeline