Skip to content

C2 Project

Active Private limited companyfounded 2019active for 6 yearsAvenue du Japon 14, 1420 Braine-l'AlleudKBO/BCE: BE 0738.979.850 subsidiary of #3 employer in Braine-l'Alleud, Professional and technical services sector

Annual accounts 2025

abbreviated format, filed on 30-06-2026, 31 days before the deadline
€1.5m
▼ 10.0%
€561,348
▼ 27.2%
€573,010
▼ 1.2%
€400,541
▼ 72.9%
27.9%
▼ 31.1 percentage points
1.21
▼ 0.92

Turnover is estimated at about €2.6m, probably between €1.8m and €4.4m.

Balance sheet

balance sheet total €2.9m on 31-12-2025
What the company ownsHow it is paid for

in €m

in euro

Position in the sector

27.9%

Higher than 33% of the 2,500 companies filing abbreviated accounts in architecture and engineering (NACE 71) in 2025.

1.21

Higher than 32% of the 2,471 companies filing abbreviated accounts in architecture and engineering (NACE 71) in 2025.

19.9%

Higher than 82% of the 2,486 companies filing abbreviated accounts in architecture and engineering (NACE 71) in 2025.

C2 Project Middle half of the sector 80% of the sector Abbreviated accounts in architecture and engineering (NACE 71)

Net result: top quarter · Equity: top quarter · Balance sheet total: top quarter · Working capital: middle half · Staff: top quarter

Staff

€71,275

Staff costs divided by the average number of full-time equivalents.

level

employees who joined employees who left

Key figures and ratios

per financial year, computed from the annual accounts
Line Trend20252024202320222021202013 months
615,480810,589881,220811,583444,590256,510
627,142619,467724,073666,951330,454168,820
113,719258,0349,04453,057168,361527,935
22,593-954,781440,329368,892309,212-
400,5411.5m1.1m874,353524,423252,665
27.9%59.1%52.3%47.9%44.9%36.7%
1.212.131.951.801.681.46
2.580.690.911.091.221.72
71.1%30.0%50.1%57.6%41.8%35.7%
19.9%17.7%26.2%27.6%18.8%13.1%
over 100over 100over 100over 100over 10055.70

EBIT margin not included in this filing.

A Belgian filing has no cash-flow statement. Cash flow is therefore an approximation, derived from the income statement. Investment is the acquisitions in the notes and, without them, the balance-sheet move.

Filed annual accounts

as filed with the National Bank, click a year to choose it
Line Trend20252024202320222021202013 months
Balance sheet: assets
20/58 2.9m3.3m2.6m2.3m1.6m1.1m
21/28 539,772480,185264,133301,374288,430326,959
21 73,03782,22295,926109,629123,333-
22/27 101,95433,18251,12674,66348,01546,228
23 22,8945,2516,6928,1329,57311,014
24 57,36927,93143,97161,61324,66212,570
25 21,691-4644,91713,78022,644
28 364,781364,781117,081117,081117,081280,731
29/58 2.3m2.8m2.3m2.0m1.3m800,760
40/41 764,659583,944658,022759,996463,384281,020
40 656,464534,838634,753732,382450,923270,085
41 108,19549,10623,26927,61312,46110,935
50/53 850,0001.5m----
54/58 682,097659,5041.6m1.2m805,064495,852
490/1 45,04846,76648,91139,19327,47423,888
Balance sheet: equity and liabilities
10/49 2.9m3.3m2.6m2.3m1.6m1.1m
10/15 805,3581.9m1.4m1.1m712,137414,349
10/11 10,25610,25610,25610,25610,25610,256
13 325,339325,33951,689199,831199,831199,831
130/1 1,0261,0261,0261,0261,026-
1311 1,0261,0261,0261,0261,026-
132 273,650273,650----
133 50,66350,66350,663198,806198,806199,831
14 469,7641.6m1.3m878,887502,050204,262
17/49 2.1m1.3m1.2m1.2m872,215713,370
17 37,5944,65235,29381,15092,695129,764
170/4 37,5944,65235,29381,15092,695129,764
42/48 1.9m1.3m1.2m1.1m771,499548,095
42 176,655155,978210,856183,197130,868112,587
44 1.0m896,647574,668559,878523,490368,354
440/4 1.0m896,647574,668559,878523,490368,354
45 248,602191,455135,559103,599116,05667,154
450/3 74,51139,51323,41524,98145,63715,464
454/9 174,091151,942112,14578,61870,41951,690
47/48 502,19067,296266,353252,1191,086-
492/3 97,36122,02310,0005,6028,02135,511
Income statement
76A ----3,089-
9900 1.5m1.7m1.6m1.3m919,184881,433
62 912,325880,374680,407468,453469,437619,387
630 54,13239,73946,28540,11332,66621,085
640/8 8,6706,5737,6655,7761,8345,536
66A -10,535--3,324-
9901 561,348770,850834,935771,470411,924235,425
75/76B 175,26519,8673,8302062,16722
75 175,26519,8673,8302062,16722
65/66B 5,0775,8564,5124,6374,3064,605
65 5,0775,8564,5124,6374,3064,605
9903 731,535784,861834,253767,040409,785230,842
67/77 158,525205,133156,464140,202111,99883,107
9904 573,010579,728677,789626,838297,787147,735
689 -273,650----
9905 573,010306,078677,789626,838297,787147,735
Appropriation of the result
9906 2.2m1.6m1.6m1.1m502,050147,735
14P 1.6m1.3m878,887502,050204,262-
791/2 --148,143---
694/7 1.7m-414,143250,000--
694 1.7m-148,143---
695 --266,000250,000--
Social balance sheet
9087 12.81310.27.76.85.8
Hours worked1013 21,88122,27917,57713,16811,693-
Document PDFPDFPDFPDFPDFPDF

The full notes are in the accounts filed with the NBB.

Source: Annual accounts 2025 at the NBB, filed on 30-06-2026.

Download as CSV

Filings

each dot is a set of accounts, on the day it reached the National Bank
Financial year Type Filed Reference Document
31-12-2025 abbreviated format 30-06-2026 2026-00237916 PDF
31-12-2024 full format 03-07-2025 2025-00232012 PDF
31-12-2023 full format 26-03-2024 2024-00051939 PDF
31-12-2022 full format 22-08-2023 2023-00356357 PDF
31-12-2021 full format 01-07-2022 2022-20159243 PDF
31-12-2020 full format 05-07-2021 2021-30600368 PDF

Social balance sheet

Item31-12-202531-12-202431-12-202331-12-202231-12-2021
Employees at the balance-sheet date141412108
full-time1211986
part-time23322
in full-time equivalents13.212.8119.27.3
12.81310.27.76.8
On a permanent contract141311108
Joined365712
Left34359

Source: social balance sheet in the 2021 to 2025 annual accounts

Investments

fixed assets acquired
Item20252024202320222021
Tangible fixed assets€109,042€10,334€9,044€53,057€27,836
Intangible fixed assets€4,676---€140,525
Financial fixed assets-€247,700---
€54,132€39,739€46,285€40,113€32,666

Source: notes to the 2021 to 2025 annual accounts (statement of fixed assets)

Public contracts

8 awards · 2024 to 2026
Honoraires et prestations diverses d'études travaux - Missions d'auteur de projet - Accord-cadre 2026/2029 N°2026.027: Honoraires et prestations diverses d'études travaux - Missions d'auteur de projet - Accord-cadre 2026/2029 N°2026.027
buyer: Commune de LasneArchitectural, engineering and inspection servicesawarded 04-11-2026€232,1843 tendersTED 770430-2026
ENGIS-FLEMALLE - Egouttage et rénovation de la chaussée de Ramioul
buyer: AIDEArchitectural, engineering and inspection servicesawarded 15-04-2026€147,8615 tendersTED 275697-2026
Désignation d'un auteur de projet pour la conception et le suivi des travaux de création d'un réseau cyclable de liaisons supracommunales: Réseau cyclable de liaisons supracommunales de Luttre - Viesville - Thiméon vers Gosselies
buyer: Commune de Pont-à-CellesArchitectural, engineering and inspection servicesawarded 01-12-2025€49,40315 tendersTED 841338-2025
Désignation d'un auteur de projet pour la conception et le suivi des travaux de création d'un réseau cyclable de liaisons supracommunales: Réseau cyclable de liaisons supracommunales de Pont-à-Celles vers Seneffe et Nivelles
buyer: Commune de Pont-à-CellesArchitectural, engineering and inspection servicesawarded 01-12-2025€38,69615 tendersTED 841338-2025
Désignation d'un auteur de projet pour la conception et le suivi des travaux de création d'un réseau cyclable de liaisons supracommunales: Réseau cyclable de liaisons supracommunales de Luttre vers Les-Bons-Villers
buyer: Commune de Pont-à-CellesArchitectural, engineering and inspection servicesawarded 01-12-2025€28,83815 tendersTED 841338-2025
Show 3 more contracts
Etude de l’aménagement d’une cyclostrade le long de la N4 entre Arlon et Steinfort: SOF-MI-O8.08.02-24-280 - 1
buyer: SOFICO (Société Wallonne de Financement Complémentaire des Infrastructures)Architectural, engineering and inspection servicesawarded 19-11-2024€64,8004 tendersTED 716179-2024
Désignation d'un auteur de projet pour l'étude technique de divers égouttages et voiries du plan PIC 2022-2024: Igretec_65680_2023-070 - lot 1
buyer: IgretecArchitectural, engineering and inspection servicesawarded 08-01-2024€237,0724 tendersTED 131646-2024
Désignation d'un auteur de projet pour l'étude technique de divers égouttages et voiries du plan PIC 2022-2024: Igretec_65680_2023-070 - Lot 2
buyer: IgretecArchitectural, engineering and inspection servicesawarded 08-01-2024€104,3025 tendersTED 131646-2024

Source: TED (Tenders Electronic Daily), Publications Office of the European Union. The values are as the buyer published them. For a framework agreement, the value is a ceiling.

Insights on C2 Project

The operating result for 2025 is 27% lower than in 2024 and the lowest since 2021. It is the second fall in a row.

Debt's share of the balance-sheet total rises from 40.9% to 72.1%. Equity is lower and debt is higher.

Large changes and their cause
  • 2022 Compared with 2021, the net result rose by 110%. Merger absorbing SCENILUM, Official Gazette 23-07-2021, in the previous financial year. That operation now counts for a full year for the first time.
  • 2021 Compared with 2020, the net result rose by 102%. The previous financial year ran 13 months, this one 12. Merger absorbing SCENILUM, Official Gazette 23-07-2021.

Next steps