Skip to content

AB Tech

Active Public limited companyfounded 1992active for 34 yearsAvenue de l'Indépendance 83, 4020 LiègeKBO/BCE: BE 0447.207.216 subsidiary of JOLY SA#3 employer in Liège, Construction sector

Overview

Lifetime

19 annual accounts with figures on one time axis, 33 filings since 1993
peak €34.9m (2021)
€24.7m▲ 3.3%
peak €2.5m (2024)
€617,869▼ 75.5%
peak €5.6m (2025)
€5.6m▲ 4.0%
€8.5m▼ 3.0%
peak 102.9 FTE (2013)
84.4 FTE▲ 1.4%
Board9 names since 2015
5 directorsFINOFAB and 4 others
Owners3 names in the annual accounts
100%JOLY SA and 1 other
Documentsfilings and deeds
02-07-202629 days before the deadline
2025financial year
Result from €2.5m to €617,869Dividend €400,000Cash from €16,122 to €27,439

Key points

from the 2025 annual accounts

Equity

€5.6m ▲ 4.0%
5.42024+0.6Profit-0.4Dividend5.62025

AB Tech paid out €400,000 in dividends. That is 65% of the 2025 profit.

Result

€617,869 ▼ 75.5%
€2.5m2024€618,0002025

The result fell in 2025 from €2.5m to €617,869.

Staff

83 employees on 31-12-2025
141620211214202217820239920248112025

In 2025, 8 people joined and 11 left. On top of that, 1.6 agency workers worked there on average.

Payment terms

94 days to suppliers
Suppliers
74 to 94
Customers
139 to 128

AB Tech pays its suppliers 20 days later than in 2024. Customers pay 11 days earlier.

Filings

33 annual accounts since 1993
AprilJune31 JulyOctober200020102020

Two of the last ten came late. The 2017 accounts came latest: 49 days after the end of the period.

Checked score

85
Excellent
Financially stronger than 43% of medium-sized companies in civil engineering (NACE 42)
Probability in this band: under 0.55%
Bankruptcy probability within 12 months
0.3% Very low
0%0.5%1.5%4%10%≥ 25%

The dashed line is the sector median: 0.2% across 105 companies (NACE 42, medium-sized).

About 3 in 1,000 comparable companies go bankrupt within 12 months (an estimate).

Last 24 months 12-2024: 0.1% 01-2025: 0.1%● unchanged vs 12-2024 02-2025: 0.1%● unchanged vs 01-2025 03-2025: 0.1%● unchanged vs 02-2025 04-2025: 0.1%● unchanged vs 03-2025lowest value 05-2025: 0.1%● unchanged vs 04-2025 06-2025: 0.1%● unchanged vs 05-2025 07-2025: 0.2%▲ +0.1 percentage points vs 06-2025 08-2025: 0.2%● unchanged vs 07-2025 09-2025: 0.2%● unchanged vs 08-2025 10-2025: 0.2%● unchanged vs 09-2025 11-2025: 0.2%● unchanged vs 10-2025 12-2025: 0.2%● unchanged vs 11-2025 01-2026: 0.2%● unchanged vs 12-2025 02-2026: 0.2%● unchanged vs 01-2026 03-2026: 0.2%● unchanged vs 02-2026 04-2026: 0.2%● unchanged vs 03-2026 05-2026: 0.2%● unchanged vs 04-2026 06-2026: 0.2%● unchanged vs 05-2026 07-2026: 0.3%▲ +0.1 percentage points vs 06-2026 08-2026: 0.3%● unchanged vs 07-2026highest value 09-2026: 0.3%● unchanged vs 08-2026highest value 10-2026: 0.3%● unchanged vs 09-2026highest value 11-2026: 0.3%● unchanged vs 10-2026highest value

Financial strength
Average

63+2equity 38.1% of total assets
28+1short-term debt 45.1% · cash 0.2%
66-16return on assets 4.2%

Score breakdown

raises risk
Liquidity: current ratio 1.52, cash €27,439
Sector: Civil engineering (NACE 42)
Size: turnover €24.7m, 84.4 FTE, total assets €14.7m
lowers risk
Founded in 1992
Calculation

The band follows from the bankruptcy probability. 10 more points roughly halve it.

75-100 Excellent under 0.55%
60-74 Healthy 0.55% to 1.5%
45-59 Fair 1.5% to 4.2%
25-44 Weak 4.2% to 15.0%
0-24 Critical over 15.0%

Where the company stands within its band depends half on the bankruptcy probability and half on how it does against its sector peers (NACE 42, medium-sized). It does better than 56% of them on solvency, 35% on liquidity, 41% on profitability and 42% on growth.

The bankruptcy probability was computed on 06-11-2026 by the bankruptcy model of 2 October 2026, which learns from Belgian bankruptcies and reads the registers, the annual accounts and the Belgian Official Gazette.

The probability rests on the annual accounts with balance sheet date 31-12-2025.

Of the companies with a bankruptcy probability in the very low class on 30-06-2025, 0.1% went bankrupt within twelve months.

Some facts cap the score, however low the probability. With negative or zero equity, a heavy loss, a special status in the KBO, one missing filing or accounts filed more than 90 days late, the score is Fair at most (59). With two missing filings, it is Weak at most (44). During a judicial reorganisation or at the company's end (bankruptcy, dissolution, liquidation), it is Critical at most (24).

Comparable companies, two years later

In July 2024, 1,887 companies had the same profile as AB Tech has now. Each dot stands for 5 companies, two years later.

97.9%
were still trading
2.0%
stopped another way
0.1%
went bankrupt
  • Medium-sized
  • 20 years or older
  • solvency 30% or more
  • a profit under 5% of the balance sheet

That fits the bankruptcy probability of AB Tech itself: 0.3% within 12 months.

Test of the method

The method was tested on the 497,447 companies of July 2024. Each company was given the bankruptcy share of the same profile a year earlier, in July 2023. The expectation was that 1.6% would go bankrupt within 24 months. In fact 1.7% went bankrupt.

The companies in ten equal groups, from the lowest to the highest expected share
Group Expected Actual
1 0.2% 0.2%
2 0.3% 0.5%
3 0.5% 0.6%
4 0.7% 0.8%
5 0.9% 0.9%
6 1.3% 1.5%
7 1.6% 1.8%
8 1.8% 1.8%
9 3.0% 3.1%
10 5.6% 6.2%

A company that went bankrupt had a higher expected share than one that kept going in 74.5% of comparisons. The level depends on the economy. In a year with more bankruptcies than the year before, the actual share is higher than the expected one.

This is an observation about 1,887 companies, not a prediction for AB Tech. The sector does not count, because the KBO no longer lists a sector for a company that has stopped. By sector, mostly the survivors would count, which would paint too rosy a picture.

Credit verdict

Credit of up to €470,000 on 30-day terms is acceptable

Liquidity is ample, with a current ratio of 1.52 (1.47 in 2024), above the usual 1.5. Short-term debt is 45.1% and cash 0.2% of total assets. However, 61.9% of the assets are financed with debt and provisions.

Credit check for an amount and term of your choice

Show the recommended maximum and see how the verdict changes with amount, term and advance.

The scores and ratios are Checked's own calculations, not a credit decision.

Signals

Five signals.
lowers riskraises riskneutral
raises risk · Liquidity: current ratio 1.52, cash €27,439
NBB · annual accounts
lowers risk · Founded in 1992
Companies that have existed this long fail less often. How much that weighs depends on the rest of the company's profile.
KBO
raises risk · Sector: Civil engineering (NACE 42)
KBO
raises risk · Size: turnover €24.7m, 84.4 FTE, total assets €14.7m
Companies of this size fail more often. How much that weighs depends on the rest of the company's profile.
NBB · annual accounts
neutral · Latest accounts filed on time
The financial year that closed on 31-12-2025 was due by 31-07-2026 and was filed on 02-07-2026, 29 days ahead of the deadline.
NBB · 10 filings
Deviation from the deadline
2025
29 days early
2024
45 days early
2023
44 days early
2022
33 days early
2021
27 days early
2020
48 days early
2019
51 days early
← before the deadline after the deadline →
tick = median of all Belgian filingsring = median in the sector

The company filed its last 7 accounts on average 40 days before the deadline. In the sector (NACE 42), the median for financial year 2024 was 2 days before the deadline, and 41% of those companies filed late.

Searched, nothing found (2)
neutral · Next filing not due yet
The next financial year closes on 31-12-2026 and is due by 31-07-2027. Nothing is late today. The company usually files around 28 June (5 of the last 5 accounts filed within 30 days either side of that date).
Companies Code · seven months
Where today falls in the filing period
07-11-2026 today31-12-2026 year end31-07-2027 deadline
neutral · No strike-offs in the KBO publications
That holds for every publication since 2021.
KBO publications

Board and ownership

JS
Managing director, Pierre JOLY
F
FINOFAB
Director, FABRY Olivier
CF
C&M FRERE CONSTRUCT
Director, Hervé Frère
D
Director, Pascal Delhez
T
TALAND
Director, Bertrand Tallieu
BR
Auditor, Cédric ANTONELLI

Shares in 1 company, WERISOL

Board & ownership

Recent changes

Registered in the Peppol Directory Reachable for e-invoices through 0208:0447207216
Reappointment: BDO Réviseurs d'Entreprises (commissaire pour les comptes statutaires) Permanent representative: Cédric ANTONELLI · General meeting of 26-06-2023 · Gazette deed
3 directors appointed, 1 resignation Resignation: Hervé Frère · Appointments: C&M FRERE CONSTRUCT, DelGest and TALAND · Permanent representatives: Hervé Frère, Pascal Delhez and Bertrand Tallieu · General meeting of 23-08-2021 · Gazette deed
Company renamed from ASPHALTE BETON ET TECHNIQUES to AB Tech Resignations: Françoise PLANARD (director) and Jean MOUSNY (director) · Reappointments: FINOFAB, FRERE Hervé and JOLY SA · Permanent representatives: FABRY Olivier and Pierre JOLY · General meeting of 22-06-2021 · Gazette deed
All 45 events

Comparable companies

same main activity, similar in size and age
Company
AB Tech Liège €24.7m 3.5% 38.1% 84.4
VANGEEL WEGENBOUW Turnhout €25.0m 24.3% 60.0% 72.3
Hardo Lokeren €27.0m 13.1% 69.7% 77
SOCIETE de TRAVAUX de LIEGE Herstal €16.7m 16.4% 24.3% 78
GEMOCO Bilzen-Hoeselt €24.0m 2.2% 25.4% 60.2
Vermetten Wegenbouw Merksplas €22.2m 22.2% 87.9% 57.1
ROBERTY Manhay €22.2m 5.5% 43.9% 66.7
-10%0%10%20%€20m€200m€2bnAB TechEBIT margin

Grey: the largest companies of the sector (civil engineering (NACE 42)), without their names. Blue: the sector peers from the table.

These companies have the same main activity as AB Tech: construction of roads and motorways (NACE 42110). They are comparable in size and age: total assets between €11m and €21m, founded between 1984 and 1997.

Official details

Source: KBO
Status
Active since 28-04-1992Normal situation
Registered office
13 active companies are registered at this address1 started in the 12 months before. Source: KBO register, as of 7 November 2026.
Activity
Construction of roads and motorwaysNACE 42110and 2 others
Joint committees
124Construction
200Auxiliary committee for white-collar workers · annual accounts 2025
Establishment unit
2.057.399.0014020 Liège, since 28-04-1992
Financial year end
31 December
Peppol
Reachable since 13-11-2025
Company details

Annual accounts 2025

€24.7m▲ 3.3%
€617,869▼ 75.5%
€5.6m▲ 4.0%
€14.7m▼ 0.3%
Employeeson 31-12-2025
83▼ 3.5%
Filing
Filed on 02-07-2026, 29 days before the end of the filing period
Financials

Companies linked to AB Tech

Parent and group

Insights on AB Tech

AB Tech has existed since 1992. Turnover grew from €20.0m in 2007 to €24.7m in 2025.

JOLY SA holds all the shares.

Sources: KBO register, filings at the National Bank, Belgian Official Gazette.

Financials

Annual accounts 2025

full format, filed on 02-07-2026, 29 days before the deadline
€24.7m
▲ 3.3%
€864,901
▼ 58.4%
€1.9m
▼ 33.2%
€1.6m
▼ 49.8%
38.1%
▲ 1.6 percentage points
1.52
▲ 0.05

Money flows

of every €100 of turnover, €2.50 remains as profit in 2025

Balance sheet

balance sheet total €14.7m on 31-12-2025
What the company ownsHow it is paid for

in €m

in €m

Position in the sector

38.1%

Higher than 46% of 377 companies in 2025.

1.52

Higher than 44% of 372 companies in 2025.

4.2%

Higher than 50% of 376 companies in 2025.

AB Tech Middle half of the sector 80% of the sector Full accounts in civil engineering (NACE 42)

Net result: middle half · Equity: middle half · Balance sheet total: middle half · Working capital: middle half · Staff: top quarter

Staff

Men and women2% women

82.6 men and 1.8 women in full-time equivalents in 2025.

€55,965

Staff costs divided by the average number of full-time equivalents.

-3 people

people who joined people who left

In 2025, 8 people joined and 11 left. Training hours in 2025: 2,705. Agency workers: 1.6 on average.

Filed annual accounts

as filed with the National Bank, click a year to choose it
Line Trend2025202420232022202120202019201820172016201520142013201220112010200920082007
Balance sheet: assets
20/58 14.7m14.8m16.7m15.1m15.9m15.5m17.2m19.3m18.0m11.1m14.6m16.7m17.8m18.7m16.5m16.3m13.1m13.9m15.5m
21/28 4.6m4.7m4.3m4.1m3.7m2.8m2.9m3.8m3.8m3.1m2.3m2.5m3.0m2.7m--2.3m3.7m4.7m
21 -----4,81010,803--8568,64912,77422,3071,2826061,4531,4572,483-
22/27 2.2m2.2m1.8m1.7m1.2m859,8251.0m1.1m1.2m481,885659,827925,2911.3m1.1m1.4m1.3m870,121889,5761.0m
23 136,746107,219160,602210,98395,970110,112100,72883,90462,92989,259119,654129,697137,11596,170113,05572,56990,945697,818788,053
24 237,644330,292381,488196,255211,50870,29052,71346,80742,22975,533237,064379,759551,985378,897398,205616,460774,725169,347160,686
25 1.8m1.8m1.3m1.3m925,240---------914,523609,871---
26 -------1,6064,2586,9109,56212,214-------
28 2.5m2.5m2.5m2.5m2.5m1.9m1.9m2.8m2.7m2.6m1.6m1.6m1.6m1.6m1.5m1.5m1.4m2.8m3.7m
280/1 1.6m1.6m1.6m1.6m1.6m1.0m1.0m1.0m1.0m1.0m1.0m1.0m1.0m1.1m1.1m1.1m1.1m2.5m3.4m
280 550,377550,377550,377550,377550,37737737737737737737737741112,80512,39512,39512,39512,39512,395
281 1.0m1.0m1.0m1.0m1.0m1.0m1.0m1.0m1.0m1.0m1.0m1.0m1.0m1.0m1.0m1.0m1.0m2.5m3.4m
282/3 -------1.0m1.0m1.0m---------
283 -------1.0m1.0m1.0m---------
284/8 862,009862,635862,560862,195864,245858,847858,842733,474632,448549,100546,095546,012566,912530,810413,710403,610351,164303,239266,639
284 78,07578,07578,07578,07578,07575,42775,42765,42757,92746,84946,84946,84946,84946,84946,84946,84935,02418,59918,599
285/8 783,934784,560784,485784,120786,170783,420783,415668,048574,521502,251499,246499,163520,063483,962366,861356,761316,140284,640248,040
29/58 10.1m10.1m12.4m11.0m12.2m12.7m14.2m15.4m14.2m8.1m12.4m14.1m14.8m16.0m13.6m13.5m10.8m10.2m10.8m
29 -96,24296,24296,24296,24240,000-------------
290 -96,24296,24296,24296,24240,000-------------
3 61,43768,251103,57986,48447,45730,22734,72749,55746,34223,88243,32886,19143,21365,41392,591126,233109,325240,547225,398
30/36 61,43768,251103,57986,48447,45730,22734,72749,55746,34223,88243,32886,19143,21365,41392,591126,233109,325240,547225,398
30/31 61,43768,251103,57986,48447,45730,22734,72749,55746,34223,88243,32886,19143,21365,41392,59154,05653,98950,67964,250
33 ---------------72,17755,336189,868161,148
40/41 10.0m9.9m10.4m10.4m10.9m12.2m10.9m12.7m12.1m6.4m9.6m12.8m13.9m15.7m13.2m12.9m9.9m9.7m10.4m
40 8.7m9.1m8.8m8.7m10.3m11.3m9.6m12.2m10.4m5.9m8.9m12.2m13.2m15.2m12.7m12.5m9.8m9.5m10.1m
41 1.3m848,4601.6m1.7m666,368917,9481.3m563,3361.8m582,667699,380670,158751,801430,447452,482417,902102,982225,118256,910
54/58 27,43916,1221.8m337,2921.1m414,8463.2m2.5m2.0m1.5m2.7m1.2m780,111274,535297,988441,016798,281246,700175,553
490/1 -1,72815,3821,3712,65634,86950,12485,62567,33762,05432,91840,61326,38325,70720,90557,90321,62420,91024,793
Balance sheet: equity and liabilities
10/49 14.7m14.8m16.7m15.1m15.9m15.5m17.2m19.3m18.0m11.1m14.6m16.7m17.8m18.7m16.5m16.3m13.1m13.9m15.5m
10/15 5.6m5.4m4.4m3.5m3.3m3.4m3.1m2.6m3.2m3.1m3.3m3.2m3.1m3.0m2.9m2.7m2.7m2.7m2.6m
10/11 322,262322,262322,262322,262322,262322,262322,262322,262322,262322,262322,262322,262322,262322,262--322,262322,262322,262
10 322,262322,262322,262322,262322,262---------322,262322,262---
100 322,262322,262322,262322,262322,262322,262322,262322,262322,262322,262322,262322,262322,262322,262322,262322,262322,262322,262322,262
13 825,485825,485825,485825,485825,485825,485825,485825,485825,485825,485825,485825,485825,485825,485825,485825,485825,485825,485825,485
130/1 32,22632,22632,22632,22632,226--------------
130 32,22632,22632,22632,22632,22632,22632,22632,22632,22632,22632,22632,22632,22632,22632,22632,22632,22632,22632,226
133 793,259793,259793,259793,259793,259793,259793,259793,259793,259793,259793,259793,259793,259793,259793,259793,259793,259793,259793,259
14 4.5m4.2m3.2m2.4m2.2m2.2m2.0m1.5m2.1m1.9m2.1m2.0m1.9m1.9m1.8m1.6m1.5m1.5m1.5m
15 -----------------3598,983
16 635,000635,000635,000-55,60655,606100,000100,000100,000100,000-------1854,626
160/5 635,000635,000635,000-55,60655,606100,000100,000100,000100,000---------
164/5 635,000635,000635,000-55,60655,606100,000100,000100,000100,000---------
168 -----------------1854,626
17/49 8.5m8.7m11.7m11.6m12.5m12.1m13.9m16.5m14.7m8.0m11.3m13.5m14.7m15.7m13.6m13.6m10.4m11.3m12.9m
17 1.8m1.8m1.7m1.8m1.6m1.3m2.0m607,309740,203154,277212,428290,021407,130334,577607,032652,937479,964535,154628,952
170/4 1.8m1.8m1.7m1.8m1.6m1.3m2.0m607,309740,203154,277212,428290,021407,130334,577607,032652,937479,964535,154628,952
170 1.0m1.0m1.0m1.0m1.0m1.0m1.5m------------
172 836,213846,389687,434805,620585,344283,797450,479607,309740,203148,047150,223142,691289,517270,142400,890299,855-11,70060,551
173 --13,33329,33345,333----6,22962,205147,330117,61264,435206,142353,082479,964523,453568,401
42/48 6.6m6.9m9.9m9.8m10.8m10.8m12.0m15.9m13.9m7.8m11.1m13.1m14.2m15.3m13.0m12.9m9.9m10.7m12.2m
42 632,018710,033490,751437,207316,726323,922366,915285,744256,206170,249182,979233,122343,830364,626561,246644,138459,890421,646471,371
43 --3.0m4.0m2.6m-4.0m5.5m4.8m2.6m3.8m4.3m4.6m4.6m5.2m4.5m3.5m4.8m2.6m
430/8 --3.0m4.0m2.6m-4.0m5.5m4.8m2.6m3.8m4.3m4.6m4.6m5.2m4.5m3.5m4.8m2.6m
44 4.8m3.5m5.1m4.1m6.4m10.0m7.4m9.8m8.6m4.2m6.8m7.1m8.6m10.1m7.1m7.5m5.8m5.4m7.9m
440/4 4.8m3.5m5.1m4.1m6.4m10.0m7.4m9.8m8.6m4.2m6.8m7.1m8.6m10.1m7.1m7.5m5.8m5.4m7.9m
45 212,209458,573363,633558,880496,598416,716144,595244,280294,713247,694253,112311,269360,807275,163188,062217,811188,499101,948191,229
450/3 116,646245,016151,083402,537425,251149,88343,516115,745183,243201,93056,98365,27893,666182,96147,29578,63890,43732,01085,770
454/9 95,562213,557212,550156,34371,347266,833101,079128,535111,47045,764196,129245,992267,14192,203140,767139,17398,06269,938105,458
47/48 1.0m2.3m1.0m650,000999,9583,5323,5323,5012,276600,6011,0061.2m351,0061,0791,60960,6409,54646,9621.0m
492/3 1,7621,76212,13517,62737,60832,72542,85038,38254,06045,45137,45946,37825,83520,47524,23725,50411,55917,7259,645
Income statement
70/76A 25.1m24.3m29.3m20.2m35.3m23.5m27.1m22.9m23.7m15.5m16.7m20.7m21.6m23.0m--16.8m16.1m20.1m
70 24.7m23.9m28.7m19.8m34.9m23.3m27.0m22.8m23.6m15.3m16.6m20.5m21.4m22.8m23.6m18.2m16.8m16.0m20.0m
71 ---------------72,17716,841-70,32428,720-17,710
74 476,434444,056594,723376,249353,784---------153,623131,164---
76A ---55,606-44,394------64,148------
60/66A 24.3m22.2m27.5m19.4m33.7m23.0m26.3m22.6m23.2m14.9m16.5m20.5m21.3m22.6m--17.0m16.1m19.9m
60 15.0m14.0m18.3m11.3m22.5m15.5m17.9m15.1m15.5m8.0m9.2m11.6m12.8m14.5m15.4m11.7m10.3m9.3m12.9m
600/8 15.0m14.0m18.3m11.3m22.5m15.5m17.9m15.1m15.5m8.0m9.1m11.6m12.8m14.4m15.5m11.7m10.3m9.3m12.8m
609 6,81535,328-17,095-39,027-17,2294,50014,830-3,215-22,46019,44642,863-42,97822,20027,179-38,535-66-3,31013,57147,783
61 3.5m3.0m3.5m3.5m4.9m3.4m4.0m3.2m3.4m2.7m2.7m3.4m3.7m3.3m3.2m2.4m2.3m2.6m2.8m
62 4.7m4.4m4.3m4.0m5.4m3.6m3.9m3.9m3.8m3.6m4.1m4.8m4.2m4.2m4.1m3.6m3.7m3.5m3.5m
630 1.0m739,599732,926556,620739,612474,053396,627402,625321,840382,867536,846568,303510,222525,689603,573495,353578,984586,660665,119
631/4 5,79125,183-5,354-112,612-6,861-106,564-63,316-53,435154,843136,401-56,851-19,590-4,591119,43657,541--60,587-10,343
635/8 --635,000------100,000---------7,000
640/8 57,84057,54349,638117,64488,90297,699184,102122,19055,22429,94858,710170,20964,69178,09454,10784,35154,39961,53469,812
66A --1,355-38,338--------11,841--114,199--
9901 864,9012.1m1.8m785,7431.6m517,087826,601272,703474,756566,189214,289180,641260,383332,694184,352198,036-177,79814,979170,382
75/76B 153,1921.1m827,764503,652132,866102,131130,232113,223181,097232,261119,060190,084126,953118,228--589,911319,471244,868
75 153,1921.1m827,764503,652132,866102,131130,232113,223181,097232,261119,060190,084126,953118,228303,10999,060589,911319,471244,868
750 57,7381.1m668,743363,19376,28875,79395,17293,75598,92277,16663,38264,14870,53558,44657,96656,526140,424143,592178,441
751 -3,1944,0984,65726,678013,1433,28651,865141,21423,806100,44338,94345,924236,14927,103435,298141,00626,717
752/9 95,45441,291154,923135,80229,90026,33821,91816,18230,31013,88131,87325,49217,47613,8588,99415,43114,18934,87339,710
65/66B 180,168146,764298,953242,147384,313218,874240,874231,381228,554203,117221,958240,117243,544254,508--279,432290,259231,968
65 180,168146,764298,953242,147384,313218,874240,874231,381228,554203,117221,958240,117243,544254,508293,809253,589279,432290,259231,968
650 136,902100,826292,977129,094172,22196,239120,297111,35798,487102,296117,317143,032146,247198,426227,691166,117270,942288,744228,616
652/9 43,26645,9385,975113,053212,092122,636120,577120,024130,067100,821104,64197,08597,29756,082--8,4911,5153,353
9903 837,9253.0m2.3m1.0m1.3m400,344715,959154,545427,299595,332111,392130,608207,941184,574193,65243,50718,48144,190183,282
67/77 220,055522,579452,007211,162368,815145,934230,79771,609153,427203,96426,95727,00154,16855,4739,368---57644,149
670/3 225,313525,627452,127211,162368,815145,934230,79771,609153,427203,96426,95727,00154,16855,4739,368--24044,205
77 5,2583,048120--------------81655
9904 617,8692.5m1.9m836,087962,716254,410485,16282,937273,872391,36884,435103,607153,773129,101184,28443,50718,66649,207149,018
9905 617,8692.5m1.9m836,087962,716254,410485,16282,937273,872391,36884,435103,607153,773129,101184,28443,50718,66649,207149,018
Appropriation of the result
9906 4.9m5.7m4.2m3.0m3.2m2.2m2.0m2.2m2.2m2.5m2.1m2.0m2.0m1.9m1.8m1.6m1.5m1.5m2.5m
14P 4.2m3.2m2.4m2.2m2.2m---------1.6m1.5m---
694/7 400,0001.5m1.0m650,0001.0m--700,000100,000600,000--100,000-----1.0m
694 400,0001.5m1.0m650,0001.0m--700,000100,000600,000--100,000-----1.0m
Social balance sheet
9087 84.483.281.878.677.980.381.382.582.484.590.7100.8102.997.7100.691.589.587.893
Men (FTE)1003 82.681.280.577.676.979.380.381.581.482.888.999101.1------
Women (FTE)1003 1.821.31111111.71.81.81.8------
Agency workers1501 1.61.61.93.3410.82.30.6-0.41.71.40.8--0.71.52.1
Hours worked1013 116,782112,513111,542114,110153,895100,908114,495110,428111,026106,876117,992145,380126,027129,208--128,729124,251130,857
Document PDFPDFPDFPDFPDFPDFPDFPDFPDFPDFPDFPDFPDFPDFPDFPDFPDFPDFPDF

The accounts for 14 older financial years (1993-2006) were filed as documents without figures as data, scans for example.

The notes to these accounts have 84 items, including the statement of assets and debts, the cost breakdown and rights and commitments. You find them in the accounts filed with the NBB.

Source: Annual accounts 2025 at the NBB, filed on 02-07-2026.

Download as CSV

Filings

each dot is a set of accounts, on the day it reached the National Bank
Financial year Type Filed Reference Document
31-12-2025 full format 02-07-2026 2026-00240335 PDF
31-12-2024 full format 16-06-2025 2025-00148094 PDF
31-12-2023 full format 17-06-2024 2024-00132853 PDF
31-12-2022 full format 28-06-2023 2023-00167448 PDF
31-12-2021 full format 04-07-2022 2022-20142947 PDF
30-06-2020 full format 14-12-2020 2020-75400168 PDF
30-06-2019 full format 11-12-2019 2019-76200372 PDF
30-06-2018 full format 05-12-2018 2018-73700416 PDF
30-06-2017 full format 21-03-2018 2018-07600513 PDF
30-06-2016 full format 28-02-2017 2017-05600099 PDF
30-06-2015 full format 30-11-2015 2015-67800137 PDF
30-06-2014 full format 10-12-2014 2014-68900597 PDF
30-06-2013 full format 17-12-2013 2013-68800421 PDF
30-06-2012 full format 21-01-2013 2013-01200106 PDF
30-06-2011 full format 14-12-2011 2011-63600546 PDF
30-06-2010 full format 24-12-2010 2010-64600121 PDF
30-06-2009 full format 18-12-2009 2009-90400213 PDF
30-06-2008 full format 24-12-2008 2008-87000158 PDF
30-06-2007 full format 06-12-2007 2007-82500351 PDF
30-06-2006 full format 29-01-2007 2007-02400164 PDF
30-06-2005 full format 31-01-2006 2006-04204992 PDF
30-06-2004 full format 01-12-2004 2004-83101319 PDF
30-06-2003 full format 12-05-2004 2004-13700286 PDF
30-06-2002 full format 19-11-2002 2002-72700502 PDF
30-06-2001 full format 10-01-2002 2002-01003864 PDF
30-06-2000 full format 28-12-2000 2000-78302059 PDF
30-06-1999 full format 30-11-1999 1999-61201466 PDF
30-06-1998 full format 26-03-1999 1999-06102709 PDF
30-06-1997 full format 24-11-1997 1997-54105073 PDF
30-06-1996 full format 12-12-1996 1996-53304725 PDF
30-06-1995 full format 20-11-1995 1995-57502207 PDF
30-06-1994 full format 21-11-1994 1994-47701099 PDF
30-06-1993 full format 18-11-1993 1993-43403435 PDF

Key figures and ratios

per financial year, computed from the annual accounts
Line Trend2025202420232022202120202019201820172016201520142013201220112010200920082007
1.9m2.8m2.5m1.3m2.3m991,1401.2m675,328796,597949,056751,135748,944770,605858,383787,925693,389401,185601,639835,501
1.6m3.3m2.6m1.4m1.7m728,463881,789485,562595,712774,236621,281671,910663,995654,790787,857538,860597,650635,867814,137
1.0m1.1m853,7981.1m1.7m314,971366,040306,5581.0m197,132267,257189,436736,245232,305730,110935,954578,578573,156646,186
11,317-1.7m1.4m-763,009685,455-2.8m663,944586,757414,054-1.1m1.5m371,517505,575-23,453-143,028-357,265551,58171,147-
3.4m3.2m2.5m1.2m1.4m2.0m2.3m-475,888287,207287,2781.3m995,909555,402694,212636,258635,282886,078-533,766-1.5m
3.5%8.7%6.2%4.0%4.5%2.2%3.1%1.2%2.0%3.7%1.3%0.9%1.2%1.5%0.8%1.1%-1.1%0.1%0.9%
38.1%36.5%26.2%23.2%20.9%21.7%18.1%13.6%17.9%27.5%22.4%19.1%17.4%16.2%17.6%16.7%20.4%19.0%16.9%
1.521.471.251.121.131.181.190.971.021.041.111.081.041.051.051.051.090.950.88
1.511.461.241.121.121.181.190.971.021.031.111.071.041.041.041.041.080.930.86
1.511.622.673.313.763.604.506.324.552.613.474.234.765.184.695.003.904.264.93
11.0%46.8%42.6%23.8%29.0%7.6%15.6%3.2%8.5%12.8%2.6%3.3%5.0%4.3%6.4%1.6%0.7%1.9%5.7%
4.2%17.1%11.2%5.5%6.1%1.6%2.8%0.4%1.5%3.5%0.6%0.6%0.9%0.7%1.1%0.3%0.1%0.4%1.0%
13.7727.978.5910.4013.4910.3010.176.068.099.286.405.245.274.333.464.171.482.083.65
128 days139 days112 days161 days107 days177 days130 days195 days160 days140 days196 days217 days225 days244 days197 days250 days213 days216 days184 days
94 days74 days85 days101 days85 days194 days124 days196 days167 days144 days210 days171 days189 days208 days138 days196 days167 days164 days185 days

A Belgian filing has no cash-flow statement. Cash flow is therefore an approximation, derived from the income statement. Investment is the acquisitions in the notes and, without them, the balance-sheet move.

Revenue breakdown

as filed

By activity 2024

  • Travaux de voirie et assimilés €23,885,512100.0%

Source: 2024 accounts, page 27, filing 2025-00148094

By geographic market 2020

  • Belgique €23,332,825100.0%

Source: 2020 accounts, page 25, filing 2020-75400168

All years (2014 to 2024)

By activity

By activity2014201520162017201820192020202220232024
Travaux de voirie et assimilés€20,485,558€16,582,124€15,264,171-€22,762,670€27,010,706-€19,778,411€28,733,554€23,885,512
Travaux de voirie et assimiés------€23,332,825---
Travaux de voiries et assimilés---€23,585,803------
Total€20,485,558€16,582,124€15,264,171€23,585,803€22,762,670€27,010,706€23,332,825€19,778,411€28,733,554€23,885,512

By geographic market

By geographic market2014201520162017201820192020
Belgique€20,485,558€16,582,124€15,264,171€23,585,803€22,762,670€27,010,706€23,332,825

Social balance sheet

Item31-12-202531-12-202431-12-202331-12-202231-12-2021
Employees at the balance-sheet date8386867779
full-time8083847779
part-time332--
in full-time equivalents81.784.784.97779
84.483.281.878.677.9
On a permanent contract8080787176
Joined89171214
Left11981416
Agency workers, average number1.61.61.93.34
Training hours2,7052,8095,4636,0002,285

Source: social balance sheet in the 2021 to 2025 annual accounts

Securities and guarantees

on own assets and for others
Item20252024202320222021
Debts secured on the company's own assets€1.5m€1.5m€4.2m-€3.5m
Debts guaranteed by Belgian public bodies---€5.3m-
----€4.0m
Mandates to pledge the business€3.8m€3.9m€3.9m€3.9m-
Pledge on other assets, amount secured€1.5m€1.5m€1.2m€1.2m€886,070
Carrying value of the other pledged assets€1.8m€1.8m€1.3m€1.3m€925,240

Source: notes to the 2021 to 2025 annual accounts (statement of debts and off-balance-sheet rights and commitments)

Investments

fixed assets acquired
Item20252024202320222021
Tangible fixed assets€1.0m€1.1m€853,798€1.1m€1.1m
Financial fixed assets----€552,649
€1.0m€739,599€732,926€556,620€739,612

Source: notes to the 2021 to 2025 annual accounts (statement of fixed assets)

Auditor

fees
Item20252024202320222021
Fee for the audit€9,445€8,520€8,520€8,405€7,250

Source: notes to the 2021 to 2025 annual accounts (relations with the auditor)

Public contracts

6 awards · 2022 to 2024
Prestations de service hivernal sur les routes gérées par le District autoroutier de Liège: O8.10.01-23-4120 - 8
buyer: SOFICOPublic administration, defence and social security servicesawarded 02-08-2024€111,4702 tendersTED 649553-2024
LIEGE - MARCHE CONJOINT - TRAVAUX POUR L'AMENAGEMENT D'UN CORRIDOR MODE DOUX EN RIVE GAUCHE DE LA MEUSE
buyer: VILLE DE LIEGE - Direction de la Gestion de l'Espace PublicConstruction workawarded 08-07-2024€9.0m4 tendersTED 486356-2024
Prestations de service hivernal sur les routes gérées par le District autoroutier de Liège: O8.10.01-23-4120 - 3
buyer: SOFICOPublic administration, defence and social security servicesawarded 02-07-2024€127,6702 tendersTED 649553-2024
Prestations de service hivernal sur les routes gérées par le District autoroutier de Liège: O8.10.01-23-4120 - 6
buyer: SOFICOPublic administration, defence and social security servicesawarded 02-07-2024€111,4702 tendersTED 649553-2024
Prestations de service hivernal sur les routes gérées par le District autoroutier de Liège: O8.10.01-23-4120 - 7
buyer: SOFICOPublic administration, defence and social security servicesawarded 02-07-2024€111,4702 tendersTED 649553-2024
Show 1 more contract
LIEGE EXPO - TRAVAUX DE CONSTRUCTION D'UNE NOUVELLE HALLE DES FOIRES - PROCEDURES NEGOCIEES: LOT 7 - ABORDS
buyer: Intercommunale de Gestion Immobilière Liégeoise (IGIL) S.C.Construction workawarded 30-06-2022€6.7m1 tenderTED 215385-2025

Source: TED (Tenders Electronic Daily), Publications Office of the European Union. The values are as the buyer published them. For a framework agreement, the value is a ceiling.

Insights on AB Tech

The operating result for 2025 is 58% lower than in 2024 and the lowest since 2022.

Debt's share of the balance-sheet total falls from 59.2% to 57.6%. Equity is higher and debt is lower.

Large changes and their cause
  • 2021 Net result +278% on 2020. This financial year ran 18 months, the previous one 12.

Board & ownership

Board

5 directors, 1 in day-to-day management, 1 auditor, last change in 2021
Director (not named in the articles) and managing director, permanent representative Pierre JOLY
director (not named in the articles) since 22-06-2021 managing director appointed by deed of 01-07-2021 term until 08-06-2027
listed in the 2025 annual accounts, filed on 02-07-2026
FINOFAB
Director (not named in the articles), permanent representative FABRY Olivier
current term since 29-06-2021 term until 08-06-2027
listed in the 2025 annual accounts, filed on 02-07-2026
C&M FRERE CONSTRUCT
Director, permanent representative Hervé Frère
current term since 14-09-2021 term until 08-06-2027
listed in the 2025 annual accounts, filed on 02-07-2026
Director, permanent representative Pascal Delhez
current term since 14-09-2021 term until 08-06-2027
listed in the 2025 annual accounts, filed on 02-07-2026
TALAND
Director, permanent representative Bertrand Tallieu
current term since 14-09-2021 term until 08-06-2027
listed in the 2025 annual accounts, filed on 02-07-2026
Commissaire pour les comptes statutaires, permanent representative Cédric ANTONELLI
current term since 11-06-2024 term until 11-06-2027
listed in the 2025 annual accounts, filed on 02-07-2026
JOLY SA
Permanent representatives 5
FABRY Olivier
Permanent representative, for FINOFAB
in office according to the deed of 01-07-2021
Pierre JOLY
Permanent representative, for JOLY SA
in office according to the deed of 01-07-2021
Bertrand Tallieu
Permanent representative, for TALAND
appointed by deed of 20-09-2021
Permanent representative, for C&M FRERE CONSTRUCT
appointed by deed of 20-09-2021
Pascal Delhez
Permanent representative, for DELGEST
appointed by deed of 20-09-2021

Office holders in the KBO →

Mandates through the years

9 names, the dashed line is today
FINOFAB
Director (not named in the articles)
JOLY SA
Director (not named in the articles), Managing director
C&M FRERE CONSTRUCT
Director
DELGEST
Director
TALAND
Director
BDO Réviseurs d'Entreprises
Commissaire pour les comptes statutaires
Hervé Frère
Director (not named in the articles)
Jean MOUSNY
Director
LeadershipBoardEarlierRest of the termmandate already running before its first mention
Mandates as a list
  • FINOFAB
    • Director (not named in the articles), from 23-11-2016 to date
  • JOLY SA
    • Director (not named in the articles), from 21-11-2018 to date
    • Managing director, appointed by deed of 01-07-2021, still in office
  • C&M FRERE CONSTRUCT
    • Director, appointed by deed of 20-09-2021, still in office
  • DELGEST
    • Director, appointed by deed of 20-09-2021, still in office
  • TALAND
    • Director, appointed by deed of 20-09-2021, still in office
  • BDO Réviseurs d'Entreprises
    • Commissaire pour les comptes statutaires, from 12-06-2019 to date
  • Hervé Frère
    • Director (not named in the articles), from before 22-06-2021 to 20-09-2021
  • Françoise PLANARD
    • Director, from 15-10-2015 to 01-07-2021
  • Jean MOUSNY
    • Director, until 01-07-2021

See the board, name and registered office on a given date →

Control

Parent
Equity €16.8m
Profit €958,028 in 2025 (profit €1.4m in 2024)
100%
This company
AB Tech
Equity €5.6m
Profit €617,869 in 2025

Further up the chainJOLY 80%

Capital

Capital
€322,261.58
Shares
400 in the 2025 annual accounts
Contribution per share
€806
Equity per share
€14,017 in 2025
Source
deed of 01-07-2021

Owners through the years

as the annual accounts name them

Source: parent in its own accounts, lists of holdings in the owners' accounts

Articles of association

deed of 01-07-2021 (in French)
DurationMost companies exist for an unlimited period, until they are dissolved.
Unlimited
Annual meetingThe shareholders approve the annual accounts, among other things, at the annual meeting.
Second Tuesday of June at 18:00

Network & group

Holdings

own 2025 accounts, the bar shows equity in euros
This companyAB Tech1 holding, 1 country 2025 accounts

Belgium 1 Equity Result

  • BE WERISOL50% €3.1m result €268,019

Source: list of holdings in its own 2025 accounts. Every holding stands with its own latest accounts.

Part of the group JOLY Group, risk and exposure

Parent

JOLY SA
0464.849.536 · 100% of the shares · equity €16.8m · profit €958,028 (2025)

At the same address

Avenue de l'Indépendance 83, 4020 Liège · 12 other companies
Gravaubel
registered office since 01-01-1968 · founded in 1941 · group JOLY
62 FTE (2025)
0402.404.104
JOLY SA
registered office since 03-05-1999 · founded in 1998 · group JOLY
5 FTE (2025)
0464.849.536
JOLY
registered office since 15-09-2021 · founded in 2021
total assets €18.4m (2025)
0773.919.745
AQUAFLUX
registered office since 01-09-2008 · founded in 2008 · accounts filed late
28 FTE (2024)
0899.664.112
TERRANOVA
registered office since 16-02-2005 · founded in 2005 · group JOLY
6.8 FTE (2025)
0872.242.806
WERISOL
registered office since 12-03-2021 · founded in 2021
turnover €1.2m (2025)
0764.999.606
CHATEAU DE DURETTE
registered office since 24-01-2008 · founded in 2008
total assets €549,542 (2025)
0895.295.152
GAMA - ASPHALT
registered office since 13-05-1993 · founded in 1993 · group JOLY
total assets €517,664 (2025)
0449.317.064
SSM ABTECH-GRAVAUBEL
registered office since 01-09-2026
founded in 2026
1041.461.680
TRANSPORT GROUPE JOLY
registered office since 20-05-2025 · group JOLY
founded in 2025
1023.528.657
and 2 more

Holdings and subsidiaries

1 holding

Holdings 1

Share, source and own figures per holding (1)
  • Equity €3.1m Profit of €268,019 in 2025 (profit of €778,886 in 2024) Checked score 97
    50%
Holdings through the years 2008 to 2025
Holdings through the years
Name2008200920122013201420152016201720182019202020212022202320242025
WERISOL 50%
DEUMER SA 0.01%0.1%0.01%
GAMA 5%

Source: list of holdings in its own accounts

Connections & network

5 current directors
Depth

The network lets you explore the ties of AB Tech.

This company Company Director Shareholding +N: links not shown yet Click a node to look further, drag to arrange, zoom with the mouse wheel.

Timeline

Timeline

45 events since 1992

Deadline for the 2026 accounts: 31-07-2027

2026
Annual accounts 2025 filed NBBfull format · 29 days before the deadline
2025
Registered in the Peppol Directory Reachable for e-invoices through 0208:0447207216
Annual accounts 2024 filed PDFfull format · 45 days before the deadline
2024
Highest result from 2007 to 2025 net €2.5m ▲35.6% The operating result of €2.1m and the net result of €2.5m are both a record.
Equity above €5m equity €5.4m ▲23.4% Equity rises from €4.4m to €5.4m.
Annual accounts 2023 filed PDFfull format · 44 days before the deadline
Power of attorney: C&M FRERE CONSTRUCTBoard meeting of 13-02-20242 points ▸
  • Board meeting, 13-02-2024
  • Power of attorney, C&M FRERE CONSTRUCT
  • The deed holds 1 more point.

Open the deed in the Belgian Official Gazette

2023
Reappointment: BDO Réviseurs d'Entreprises (commissaire pour les comptes statutaires)Permanent representative: Cédric ANTONELLI · General meeting of 26-06-20233 points ▸
  • General meeting, 26-06-2023
  • Auditor reappointment, BDO Réviseurs d'Entreprises (commissaire pour les comptes statutaires)
  • Permanent representative, Cédric ANTONELLI (représentant permanent pour exercer le mandat de commissaire)

Open the deed in the Belgian Official Gazette

Annual accounts 2022 filed PDFfull format · 33 days before the deadline
2022
Annual accounts 2021 filed PDFfull format · 27 days before the deadline
2021
Power of attorney: Alain GUINTENSGeneral meeting of 06-10-20212 points ▸
  • General meeting, 06-10-2021
  • Power of attorney, Alain GUINTENS

Open the deed in the Belgian Official Gazette

3 directors appointed, 1 resignationResignation: Hervé Frère · Appointments: C&M FRERE CONSTRUCT, DelGest and TALAND · Permanent representatives: Hervé Frère, Pascal Delhez and Bertrand Tallieu · General meeting of 23-08-20219 points ▸
  • General meeting, 23-08-2021
  • Director resignation, Hervé Frère
  • Director appointment, C&M FRERE CONSTRUCT
  • Director appointment, DelGest
  • Director appointment, TALAND
  • Permanent representative, Hervé Frère (director)
  • Permanent representative, Pascal Delhez (director)
  • Permanent representative, Bertrand Tallieu (director)
  • Power of attorney, C&M FRERE CONSTRUCT
  • The deed holds 1 more point.

Open the deed in the Belgian Official Gazette

Company renamed from ASPHALTE BETON ET TECHNIQUES to AB TechResignations: Françoise PLANARD (director) and Jean MOUSNY (director) · Reappointments: FINOFAB, FRERE Hervé and JOLY SA · Permanent representatives: FABRY Olivier and Pierre JOLY · General meeting of 22-06-202115 points ▸
  • Power of attorney, Philippe BOVEROUX
  • General meeting, 22-06-2021
  • Name change, AB Tech
  • Director resignation, Françoise PLANARD
  • Director resignation, Jean MOUSNY
  • Director discharge, Françoise PLANARD
  • Director discharge, Jean MOUSNY
  • Director reappointment, FINOFAB (director (not named in the articles))
  • Director reappointment, FRERE Hervé (director (not named in the articles))
  • Director reappointment, JOLY SA (director (not named in the articles))
  • Permanent representative, FABRY Olivier
  • Permanent representative, Pierre JOLY
  • Director appointment, JOLY SA (managing director)
  • Power of attorney, FABRY Olivier
  • Capital, €322,261.58, 400 shares
  • The deed holds 3 more points.

Open the deed in the Belgian Official Gazette

2020
Annual accounts 2020 filed PDFfull format · 48 days before the deadline
Appointment: BDO Réviseurs d'Entreprises (commissaire pour les comptes statutaires)Permanent representative: Cédric ANTONELLI · General meeting of 06-12-20193 points ▸
  • General meeting, 06-12-2019
  • Auditor appointment, BDO Réviseurs d'Entreprises (commissaire pour les comptes statutaires)
  • Permanent representative, Cédric ANTONELLI (représentant permanent pour exercer le mandat de commissaire)

Open the deed in the Belgian Official Gazette

2019
Annual accounts 2019 filed PDFfull format · 51 days before the deadline
2018
Annual accounts 2018 filed PDFfull format · 57 days before the deadline
Annual accounts 2017 filed PDFfull format · 49 days late
2017
Annual accounts 2016 filed PDFfull format · 28 days late
2015
Annual accounts 2015 filed PDFfull format · 62 days before the deadline
2014
Annual accounts 2014 filed PDFfull format · 52 days before the deadline
2013
Annual accounts 2013 filed PDFfull format · 45 days before the deadline
Annual accounts 2012 filed PDFfull format · 10 days before the deadline
2011
Annual accounts 2011 filed PDFfull format · 48 days before the deadline
2010
Annual accounts 2010 filed PDFfull format · 38 days before the deadline
2009
Annual accounts 2009 filed PDFfull format · 44 days before the deadline
Weakest financial year net €18,666 ▼62.1% The net result drops to €18,666, the lowest from 2007 to 2025. It recovers the following year.
2008
Annual accounts 2008 filed PDFfull format · 38 days before the deadline
2007
Annual accounts 2007 filed PDFfull format · 56 days before the deadline
Annual accounts 2006 filed PDFfull format · 2 days before the deadline
2006
Annual accounts 2005 filed PDFfull format
2004
Annual accounts 2004 filed PDFfull format
Annual accounts 2003 filed PDFfull format
2002
Annual accounts 2002 filed PDFfull format
Annual accounts 2001 filed PDFfull format
2000
Annual accounts 2000 filed PDFfull format
1999
Annual accounts 1999 filed PDFfull format
Annual accounts 1998 filed PDFfull format
1997
Annual accounts 1997 filed PDFfull format
1996
Annual accounts 1996 filed PDFfull format
1995
Annual accounts 1995 filed PDFfull format
1994
Annual accounts 1994 filed PDFfull format
1993
Annual accounts 1993 filed PDFfull format
1992
Incorporation published on 16-05-1992
First establishment ABTECH, Avenue de l'Indépendance 83, Liège

Financial milestones sit on the financial year-end date, not the filing date.

Sources: Publications in the Belgian Official GazetteFilings with the National Bank

History

AB Tech was incorporated on 28 April 1992.1 Since 2021 the company has been called AB Tech.2 Turnover went from €27.0m in 2019 to €24.7m in 2025 and headcount from 81.3 to 84.4 full-time equivalents.3

  1. 1KBO register
  2. 2Belgian Official Gazette, 01-07-2021
  3. 3National Bank, annual accounts 2019 and 2025

Company details

Identity

Enterprise number
0447.207.216
VAT number
BE 0447.207.216
Peppol ID
0208:0447207216
LEI code
549300ES3UMHEVZB4U20 no longer live in the LEI register
Legal form
Public limited company
Status
Active, normal situation
Founded
28-04-1992
Financial year
ends on 31 December
Annual meetingThe shareholders approve the annual accounts, among other things, at the annual meeting.
Second Tuesday of June at 18:00
deed of 01-07-2021 (in French)
Peppol
Reachable since 13-11-2025Follow this company and you will hear the next morning if it leaves the Peppol register.
Name
AB Tech in French
Name in the Peppol Directory
ABTECH
Former name
ASPHALTE BETON ET TECHNIQUES until the deed of 01-07-2021
Entity type
Legal entity
DurationMost companies exist for an unlimited period, until they are dissolved.
Unlimited
deed of 01-07-2021 (in French)
Name clauseThe company operates under this name according to its articles.
AB Tech
deed of 01-07-2021 (in French)

Activities

NACEBEL 2025
VAT activities
Social security (RSZ) activities
Joint committees annual accounts 2025
JC 124 Construction
JC 200 Auxiliary committee for white-collar workers
Codes under NACEBEL 2008
VAT activities
42110 Construction of roads and motorways main activity
42911 Civil engineering
42919 Civil engineering
Social security (RSZ) activities
42110 Construction of roads and motorways main activity
Codes under NACEBEL 2003
VAT activities
45230 main activity
45241
45242
Social security (RSZ) activities
45230 main activity
PurposeThe purpose describes the activities the company may carry out under its articles.
“Entreprise de travaux de construction de routes tant en asphalte qu'en béton; Entretien des routes de tous types; Égouttage; Construction de…”
15 activities
  1. Entreprise de travaux de construction de routes tant en asphalte qu'en béton
  2. Entretien des routes de tous types
  3. Égouttage
  4. Construction de canalisations
  5. Construction d'écrans anti-bruit
  6. Terrassement
  7. Pose de câbles et de conduites d'eau
  8. Travaux en béton armé ainsi que tous travaux de réfection et entretien annexes aux activités ci-avant
  9. Entreprise de location de main-d’œuvre et de matériel divers
  10. Achat et vente de matériaux de construction
  11. Importation et exportation de ces articles
  12. Réalisation de tous travaux hydrauliques en ce compris extraction de graviers mise à gabarit ou profilage de cours d'eau dans cours d'eau navigables ou non navigables travaux sous eau construction de murs de quai et de batardeaux
  13. Entreprise de génie civil et notamment construction d'égouts collecteurs
  14. Réalisation de tous travaux de revêtements pour terrains de sport
  15. Installation d'épuration d'eau
deed of 01-07-2021 (in French)

Registered office and establishments

1 establishment
Establishment Since Unit number
ABTECH registered office Avenue de l'Indépendance 83, 4020 Liège 28-04-1992 2.057.399.001

Buildings and parcels at the address

Ground area
2.2 ha
Buildings
603 m²
Volume, LiDAR
4,638 m³
Tallest building
8.3 m
Buildings to scale, each on its own parcel
603 m², 8.3 m 603 m², 8.3 m

Location

registered office establishment The establishment unit on the map
13 companies at this address See who is registered here

Parcels

Cadastral parcelArea Buildings Height / floors
62113B0782/00E0032.2 ha 1 · 603 m² 8.3 m · 3

Recognitions

Recognised contractor

22 categories
AB Tech SAapproval number 22157
  • C General road works contractsclass 7, up to €6,396,000
  • C1 Ordinary sewer worksclass 7, up to €6,396,000
  • C2 Water supply and laying all kinds of pipesclass 4, up to €1,080,000
  • C3 Non-electric road signs, safety devices, fences and screensclass 1, up to €162,000
  • C5 Bituminous paving and surface dressingclass 7, up to €6,396,000
  • C6 Laying power and telecom cables in trenchesclass 1, up to €162,000
  • C7 Horizontal pipe jacking for cables and pipesclass 1, up to €162,000
  • D General building contractsclass 1, up to €162,000
Show all 22 categories
  • D1 All shell construction and roofing-in of buildingsclass 1, up to €162,000
  • E General civil engineering contractsclass 1, up to €162,000
  • E1 Trunk sewersclass 1, up to €162,000
  • E2 Pile foundations, sheet piling and diaphragm wallsclass 1, up to €162,000
  • E4 Horizontal jacking of structural elementsclass 1, up to €162,000
  • G General earthworks contractsclass 4, up to €1,080,000
  • G1 Drilling, probing and injectionclass 1, up to €162,000
  • G2 Drainage worksclass 1, up to €162,000
  • G3 Plantingclass 1, up to €162,000
  • G4 Special surfaces for sports groundsclass 1, up to €162,000
  • H General railway contractsclass 1, up to €162,000
  • H1 Rail weldingclass 1, up to €162,000
  • L1 Pipework installationsclass 1, up to €162,000
  • L2 Pumping and turbine station equipmentclass 1, up to €162,000
decision 10-07-2024

Invoicing and payment

Check the withholding obligation If you pay this company for building or cleaning work, check before every payment whether you must withhold part of the invoice. Use the enterprise number 0447.207.216